• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Case

Engineering Culture at Beck- Case Project Management Case Studies in Project, Program, and Organizational Project Management, ISBN: 9781118174296

Document preview thumbnail
Preview 1 out of 4 pages

This note includes my personal answer to cases in the book mentioned below: Milosevic, D. Z., Patanakul, P., & Srivannaboon, S. (2010). Case Studies in Project, Program, and Organizational Project Management. John Wiley and Sons Inc.

Content preview

CASE STUDIES IN PROJECT MANAGEMENT SYSTEMS 1



Engineering Culture at Beck
Dragan Z. Milosevic, Peerasit Patanakul, and Sabin Srivannaboon


I. PROBLEM AND SOLUTION

Problem: How can Beck Engineering adapt to the rapid and discontinuous change in demand
and technology?

Solution: Use Scrum Methodology which focuses on short, sharp delivery of projects - allowing
time for rapid feedback and speedy response to changes. There’s a huge focus on tight team
dynamics and close collaboration; teams come together to work on a “sprint” - a short period.

II. EXECUTIVE SUMMARY
Beck is a company established in 1946, and its primary income comes from projects.
However, it was operating in an environment that had fast and intermittent modifications in
demand, competition, and technology. All competitive advantages became available temporarily
due to the instability within the industry. Meanwhile, Jim Traddell is a director of a Project
Management Office partnered with Raja James to help him in the aspects of the culture since the
team was curious to learn about the engineering culture at Beck. Thus, a meeting with an engineer
was arranged to be conducted in a local restaurant. Raja was about to leave the office to meet his
informant. They found out that the new Beck was in the making for years and the senior managers
spent a lot of time creating project culture. Those platforms and derivatives products helped
employees come about. Managers appreciated that Beck would not survive if it didn’t have high-
value products that were designed and developed by engineers. That’s why they were respected
and held in high regard. Also, in terms of cost, the new Beck used the design to cost approach
whereas the target product prices must be set first then the product is designed backward. The
desire is to first obtain the real product, component, and feature prices, then determine spare part
prices. Thus, they established Kano’s maps to identify the price of each feature, thus providing
them awareness to which combinations of features make money, and which don’t. Another thing
that they found out was that Beck tried to be customer-centric whereas they help translate what
customers precisely want of the product design. They used tools of survey design, customer
segment, and custom visit documents to understand what customers wanted before the work began
and for undecided customers, they designed all of the tools and processes to help them determine
the customer’s preferences. Meanwhile, Beck is culturally different among others in the sense that
they worked very hard to show to their engineers that all products are equally made and the
customer has every right to see how long down the manufacturing line their product is. Also, they
placed a lot of determination to identify not only the product production status but where it will be
the next day, in the next two days, until its completion.

III. BRIEF HISTORY
Beck is a company established in 1946, and its primary income comes from projects. Its
annual income is approximately $ 800 million, with 4,000 employees. However, it was operating
in an environment that had fast and intermittent modifications in demand, competition, and
technology. All competitive advantages became available temporarily due to the instability within
the industry. Administrative units are inaccurately tied with a lot of entrepreneurial behavior. Any

Connected book
 image
Dragan Z. Milosevic, Peerasit Patanakul, Sabin Srivannaboon Case Studies in Project, Program, and Organizational Project Management
Publisher: 2011 ISBN: 9781118174296 Edition: Unknown

Document information

Uploaded on
February 13, 2022
Number of pages
4
Written in
2018/2019
Type
Case
Professor(s)
Dr. manahan
Grade
A
$5.98

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
GelC
1.0
(1)
Sold
5
Followers
4
Items
34
Last sold
2 year ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions