100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Summary

Summary Modeling and System Development (INFOMSO)

Rating
-
Sold
2
Pages
37
Uploaded on
02-11-2021
Written in
2021/2022

All subjects discussed in the Modeling and System Development (MSO) course, clearly summarized. Based on the lectures, recorded clips and the books 'Applying UML and Patterns (second edition)' and 'Design Patterns Explained (second edition)'.

Show more Read less
Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Study
Course

Document information

Summarized whole book?
Yes
Uploaded on
November 2, 2021
File latest updated on
November 12, 2021
Number of pages
37
Written in
2021/2022
Type
Summary

Subjects

Content preview

MSO
History 1

Unified Process 3
Inception 3
Elaboration 4
Construction 4
Transition 5

Requirements 6
Elicitation 6
Specification 7
Validation and verification 8
Abstract classes 8

UML 9
Activity diagram 9
Class diagram 10
Sequence diagram 11

Object-Oriented Design 12
Analysis 12
Design 14

Design Patterns 17
Facade 19
Adapter 19
Strategy 20
Bridge 22
Abstract factory 23
Decorator 25
MVC 26
Observer 27
Template method 27
Factory method 28
Singleton 29
Object pool 29
Composite 30
Iterator 31

More design 32

Refactoring 33

Testing 34

,History
1940 - 1960 Pioneers era, technical field

1960’s Waterfall model
- 5 consecutive phases
1. Requirements analysis
2. Design
3. Coding and debugging
4. Testing and verification
5. Maintenance
- Advantages: structured, clear and understandable phases and a
focus on documentation and testing
- Problems: aims to complete every phase before moving on to the
next one, which makes it unable to deal with change and users are
only involved late into the project

1970 - 1980 Software systems more mainstream, growing criticism of waterfall,
introduction of waterfall variants (sashimi model)

1980’s Prototype, discard and re-build
Spiral model Boehm
- Iterative waterfall with a lot of focus on risk
- Advantages: iterative, risk focused, flexible, early user testing
- Problems: complex, unclear and spirals out of control
(procrastination)




1

,1990 - 2000 Waterfall reimagined: V-Model
Emergence of agile methods
- Advantages: customers closely involved, adaptive, reduced risk
- Problems: resources not optimally used, more beneficial to
management than developer (too many meetings), fragmented
features
- Examples: Rational Unified Process (RUP), RAD, DSDM, ASD, FDD,
MoSCoW, Scrum, Extreme Programming




2

, Unified Process
- Emphasises iterative software development
- Develop software in time-bound mini-projects called iterations with clearly
defined milestones
- Output of an iteration is a usable subset of the final system
- An iteration may occasionally be revisited to adapt to feedback from
stakeholders
- Use case driven
- Common elements:
- Requirements, analysis and design
- Modelling and design patterns
- Integrations
- Verification and validation

Stakeholders End users, project management, upper management, implementers, testers

Phases of UP
1. Inception: define the scope of the project
2. Elaboration: plan the project, specify features, baseline architecture
3. Construction: finish the construction
4. Transition: hand over the project to end users
- These phases do not overlap, but the various types of activities in these phases (e.g.
business modeling, analysis & design, implementation, etc.) do overlap in time

Agile (vs UP)
- Agile (Scrum for example) puts individuals and interactions before processes and tools
- Prototypes are more important than comprehensive documentation
- Customer collaboration rather than contract negotiation
- Respond to change rather than following a clearly defined plan

Inception
Best practices:
- Involve users early
- Manage requirements
- Visually model software (UML)
- Verify software quality (test, code reviews)
- Embrace change

Goals
- Envision the product scope, vision and business case
- Stakeholders should have a basic agreement on the vision and are able to decide
whether to continue or not
- Inventorize use cases, write a brief description of each one
- A project cost estimate is provided




3
$11.98
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Suniht Universiteit Utrecht
Follow You need to be logged in order to follow users or courses
Sold
93
Member since
4 year
Number of followers
55
Documents
19
Last sold
1 month ago

3.9

13 reviews

5
7
4
2
3
2
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions