KENTUCKY UST CERTIFICATION TEST
BANK WITH ACCURATE ANSWERS AND
EXPERT REVIEW

⩥ STI-P3 tanks are delivered with shipping plugs in tank openings.
What should be done to these plugs prior to testing. Answer: remove the
plugs and replace them with a standard threaded plug that is properly
doped


⩥ should dielectric bushings be installed in all openings of an STI-P3
tank. Answer: yes on all openings


⩥ what is the maximum air pressure to which a steel tank should be
subjected in a pre-installation test. Answer: 5 pounds


⩥ for fiberglass reinforced plastic (FRP) tanks up to 12 feet in diameter
what is an acceptable air pressure to which the tanks may be subjected in
a pre-installation test?. Answer: 3 pounds


⩥ for FRP tanks over 12 feet in diameter what is the maximum air
pressure to which the tanks should be subjected in a pre-installation
test?. Answer: 3 pounds

,⩥ when you are conducting an air test on a tank the type of gauge that
should be used is?. Answer: a pressure gauge with a maximum limit of
10 to 15 PSIG


⩥ the proper procedure for conducting a pre-installation air test of a steel
tank is to?. Answer: apply 3 to 5 pounds of pressure and soap all
surfaces and weld seams visible through the coating while inspecting for
bubbles.


⩥ what is the proper procedure for conducting a pre-installation air test
of an FRP tank Under 12 feet in diameter is to..... Answer: apply 3
pounds of air pressure and soap all surfaces while inspecting for any
sign of a leak either audible or visible in the form of bubbles on the
surface


⩥ a double-walled steel tank build in accordance with UL standard 58
is?. Answer: requires air testing of the interstitial space prior to
installation


⩥ the proper procedure for conducting a pre-installation air test of a
double-walled tank is to?. Answer: pressurize the inner tank monitor the
pressure for one hour and then pressurize the space between the inner
and outer tanks with the air from the inner tank


⩥ when shipped a steel tank is covered with a coating that is an
important part of the tanks Corrosion Prevention system. "holidays"

,which show up in the coating at the installation site should?. Answer:
should be touched up with a compatible coating after proper surface
preparation


⩥ touch up of holidays in a steel tank coatings at the installation site
should be done........ Answer: according to the manufacturer's
instructions


⩥ dielectric bushings are usually made of what?. Answer: non-metallic
material


⩥ factors to consider in determining the size shape and depth of a tank
excavation include what?. Answer: *the tank manufacturers
recommendations
*the requirements for compacting bedding and backfill as well as
stability of the soil
*the depth of cover


AKA all of the above


⩥ in the absence of local requirements the recommended minimum
distance between a tank excavation and adjacent structures or property
lines is how many feet?. Answer: 5 feet

,⩥ reinforcement of a steel underground tank may be required by the tank
manufacturer if. Answer: the burial depth is greater than the tank
diameter


⩥ according to FRP tank manufacturers specifications the burial depth
for an FRP tank should not exceed how many feet?. Answer: 7 feet


⩥ when installing a cathodically protected steel tank you should.
Answer: make sure the excavation is free from material that could cause
damage to the coating


⩥ when installing dielectric bushings in a cathodically protected steel
tank prior to placing the tank in the excavation you should. Answer:
make sure that no electric current can pass through the dielectric flanges
or bushings


⩥ industry codes as well as the specifications of individual
manufacturers do not entirely agree as to the minimum space that should
be maintained between tanks and stalled in stable soil conditions. what
ranges of minimum spacing between tanks derived from various industry
codes and manufacture specifications which range is most accurate..
Answer: from 12 inches to 24 inches


⩥ acceptable bedding material for steel tanks include..... Answer: clean
washed well granulated gravel sand or Rock between 1/8 inch and 1/2
inch in size

Document information

Uploaded on
November 28, 2026
Number of pages
33
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
4
Followers
0
Items
9515
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions