• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

NERC Practice Test Question Set - Expert-Verified Solutions

Document preview thumbnail
Preview 2 out of 5 pages

NERC Practice Test Question Set - Expert-Verified Solutions a. 100 MW - answer - Using the shown diagram, determine the HVDC schedule. a. 100 MW b. 150 MW c. 200 MW d. 300 MW b. The Balancing Authority would over respond to an external loss of generation - answer - What would be the consequence of an interconnected Balancing Area operating with its AGC in Flat Frequency mode? a. The Balancing Authority would not respond sufficiently to an external loss of generation b. The Balancing Authority would over respond to an external loss of generation c. The primary frequency response from governor action will be withdrawn by AGC d. ACE will no longer be affected by an external loss of generation d. Decrease output of Generator 2 - answer - Use the diagram to answer the following question: Line 2 is exceeding its SOL by 20 MW. Which of the following actions would be most appropriate? a. Increase the HVDC schedule by 50 MW b. Shed load at Load 2 c. Decrease output of Generator 1 d. Decrease output of Generator 2 c. The primary frequency response from governor action will be withdrawn by AGC - answer - What would be the consequence of an interconnected Balancing Area operating with its AGC in Flat Tie-line mode? a. An internal loss of generation would not affect ACE b. The Balancing Authority would over respond to an external loss of generation c. The primary frequency response from governor action will be withdrawn by AGC d. An external loss of generation would not affect ACE b. Shed load at Load 2 - answer - Use the diagram to answer the following question: Line 3 is exceeding its SOL by 20 MW. Which of the following actions would be most appropriate? a. Increase the HVDC schedule by 50 MW b. Shed load at Load 2 c. Decrease output of Generator 1 d. Decrease output of Generator 2 b. EEA 2 - answer - Balancing Authority Z is unable to meet its demand, however, is maintaining its Contingency Reserve requirements. What Energy Emergency Alert level is the Balancing Authority in? a. EEA 1 b. EEA 2 c. EEA 3 d. This condition does not require an EEA c. EEA 3 - answer - Balancing Authority C has implemented demand management procedures per its EOP-011 Emergency Operating Plan for Energy and Capacity Emergencies. The expected demand peak is two hours away and the Balancing Authority is developing a load shed plan for implementation. What level EEA should the Balancing Authority request from the Reliability Coordinator? a. EEA 1 b. EEA 2 c. EEA 3 d. This condition does not require an EEA b. Transmission Operator - answer - A low voltage event has resulted in load shed of 290 MW. Who is responsible for reporting? a. Balancing Authority b. Transmission Operator c. Load Serving Entity d. This is not a reportable event per EOP-004 b. Planned outage of primary control center for 2 weeks - answer - When is a tertiary control center necessary? a. Planned outage of primary control center for 1 week b. Planned outage of primary control center for 2 weeks c. Planned outage of primary control center for 1 month d. Anytime the primary control center is out c. Thermal - answer - Exceeding which of the following transmission line ratings will result in line sag? a. Stability b. Voltage c. Thermal d. PV Curve a. GIC - answer - Which of the following could result in EHV transformer problems and loss of reactive resources? a. GIC b. Sub-synchronous resonance c. Ferranti rise d. AGC malfunction a. Balancing Authority - answer - Which of the following entities is responsible for developing load forecasts? a. Balancing Authority b. Distribution Provider c. Purchase-Selling Entity d. Load-Serving Entity b. PV - answer - What type of solar is instantaneous? a. Concentrated Solar b. PV c. Parabolic Trough d. Saturated Thermal a. MVAR output will decrease - answer - During system restoration, what will a generator producing MVAR do when a nearby line is placed in service? a. MVAR output will decrease b. MVAR output will increase c. MW output will decrease


Document information

Uploaded on
November 26, 2026
Number of pages
5
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SARAHnkalu
4.6
(7)
Sold
50
Followers
0
Items
9092
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.