Density Testing LBR Mastery Practice with Verified
Answers 2027
,
,
, 1. Earthwork Level 2: Compaction goal?
A. Achieve dense stable soil for foundation, ≥95%+ Standard Proctor
Density ASTM D698
B. No goal
C. Decrease density
D. Only moisture
Answer: A
Rationale: A goal dense stable foundation 95%+ Standard Proctor D698. No
goal false goal exists. Decrease density false increase. Only moisture false
density and moisture.