• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Xcel Final Exam Question Set - Practice-Ready Answer Guide

Document preview thumbnail
Preview 2 out of 9 pages

Xcel Final Exam Question Set - Practice-Ready Answer Guide What gloves should be used when working on 600-13,800 volts ? - answer - Class 2 gloves The minimum length for shot gun in underground switching is ? - answer - 8 feet No tools should be within how many feet of energetic things ? - answer - 10 feet Minimum approach distance for 8kv phase to ground ? - answer - 2' 2" Xcel minimum ground standard is ? - answer - 2/0 OSHA minimum ground stand is ? - answer - 2 What is the requirement for current flow ? - answer - Complete circuit voltage Ways a de energized cable can be reenergized ? - answer - Static Sackfeed Lightning Human error Every how many feet do you need a ladder or ramp in a trench ? - answer - 25 feet Excavation check list must be filled out at what depth ? - answer - 2 feet Positivity and negatively charged atoms are called ? - answer - Ion What wire runs between the 3 and 4 way switches ? - answer - Travelors What size wire is used to connect the neutral bus of a single phase transformer ? - answer - 4 copper According to Xcel energy construction standards a ground rod is required in a non metallic secondary pedestal ? - answer - true Pole depth - answer - 10 % + 2 feet dead end poles are 10% + 3 feet Isolation should be sanded with _______ sand paper ? - answer - 120 sand paper grit A pedestal is always to be served by _______ or _______ aluminum secondary ? - answer - 350 aluminum Maximum number of cable runs per phase to be served out of a 3 phase transformer ? - answer - 8 The jumper from top of cutout to overhead line is ______? - answer - 4 copper When is pole set to proper depth the manufacturer brand or pole tag should be how many feet above grade? - answer - 6 feet The lead wire from 1/0 pothead termination to bottom of cutout is made with ______ ? - answer - 2 copper a grounded wire system must be grounded how many times per mile ? - answer - 4 time per mile The minimum cable bending radius for Le shielding is ______ times the cable diameter - answer - 12 times Employees shall wear a full body harness with a shock absorbing lanyard, no more than ______ feet in length - answer - 6 feet Working handlines shall be a minimum of _______ inch in diameter - answer - 1/2 " All underground cables and apparatus energized above _____ volts shall be de energized and grounded before work starts - answer - 600 A four foot shotgun shall not be used in any switching operations - answer - false Whenever excavating is done within ______ of buried energized facilities it shall be done only by hand digging - answer - 24 inches Employees must be protected from fall hazards whenever they are ______ feet or more above a lower level - answer - 2' Maintenance / 4' Construction What class of rubber gloves should be used when working on lines energized between 50 and 600 volts - answer - 0 All Xcel Energy, insulating rubber blankets must be laboratory inspected and tested every _______ months - answer - 8 months All employees shall wear hearing protection when exposed to sound levels of ______ dBA or greater - answer - 90 Prior to cutting or handling any underground cable, the cable shall be _________ using only approved equipment - answer - Electrically tested No tool, equipment, device or apparatus shall be used while a properly authorized _________ card is attached - answer - Unsafe An electrical line that is separated from all sources of electrical potential but is not grounded considered _______ - answer - energized Opening or cutting the concentric neutral wire on underground cable can result in a primary voltage on the neutral - answer - True The _______ principle deals with using ground cables to control voltage by keeping all parts of a work zone the same potential - answer - Bonding Step potential is the voltage that can appear between a workers feet during ______ - answer - switching surges lightning phase to ground faults After the first step of " Perform switching procedu


Document information

Uploaded on
November 2, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SARAHnkalu
4.6
(7)
Sold
48
Followers
0
Items
6180
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.