LSU CM Exit Study Guide 2026 - Practice Exam Solutions Conventional concrete typically weighs ____________ - answer - 140pcf - 150pcf BTU - answer - British Thermal Unit - A quantity of heat. It is the amount of heat needed to raise a pound of water 1°F. An MBH is 1,000 BTUs/hr. Sensible Heat - answer - "Dry Heat" - Heat added to the air without adding moisture. As sensible heat increases the points on the psychrometric chart move to the right. Latent Heat - answer - The hidden heat added to the air by adding moisture (approx. 1,000 BTUs/lb of water). As latent heat increases the points on the psychrometric chart move up. Enthalpy - answer - (h) - is the total amount of thermal energy (sensible & latent) in the air. It is measured in BTUs per lb of dry air. Depreciable value is the purchase price less the __________ - answer - Salvage Value The difference between a current asset and a long term asset is ______________ - answer - Current assets can be liquidated within one year and long term assets cannot Current Ratio - answer - This accounting ratio is calculated by dividing the total current assets by the total current liabilities Working capital of a construction company increases when - answer - A company sells equipment or assets When an owner decides to add additional work to the original scope, this is considered what type of change? - answer - Owner Directed Change Order All of the following are steps that a construction company can follow in applying risk management except one. - answer - Avoid all risky situations. Complete the risk statement...if a/an _______________ happens, then the steel material for the project may cost more than the budget, which will impact the stele subcontractors, causing an increase in the project cost. - answer - Fluctuation in the steel price. Which of the following best describes risk? - answer - The potential event that results in an outcome that is different than what's planned. Typical steps associated with the risk management process are identify the risk, analyze the identified risks, _____________, allocate risks contractually, and monitor and control risks throughout the design and construction of a project. - answer - Mitigate and plan to address risks. Which of the following is not a risk identification tool and technique that construction managers use. - answer - Value Engineering Change Order - answer - A written order to the contractor authorizing changes in work to the signed original documents (not the bid documents) An acceptance is ______________________________. - answer - An unconditional agreement with an offer What is the constructive acceleration? - answer - It is the forced completion of the contract work in a shorter period than should have been allowed by the issuance of a warranted time extension. What is the cardinal rule of documentation and records? - answer - Put it in writing. Which one of the following is NOT an alternative dispute resolution method? - answer - Litigation __________________ is a sum withheld from progress payments to the contractor in accordance with the terms of the contract - answer - Retainage (retention) Define progress curves. - answer - A display of cumulative costs, labor hours, or other quantities against time as s-curves. From the following list, which tool does not help a project manager to control costs on a project? - answer - Baseline schedules If a project that is 40% complete has a cost variance of -$45,000, what does this mean? - answer - The project is currently $45,000 over-budget In earned value, if a project has a BCWP equal to $5,000, what does the $5,000 represent? - answer - The Earned Value of the Project Which one of the following would a project manager not find the information needed to calculate and plot the ACWP for an earned value analysis? - answer - Three-week look ahead schedule Define earned value: - answer - A project management methodology used to track project performance and fo


Document information

Uploaded on
October 31, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
8
Followers
0
Items
3929
Last sold
9 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.