Final Exam |Elaborated| PROJ430 - Advanced Project Management
Final Exam |Elaborated| PROJ430 - Advanced Project Management PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks the beginning or ending of an activity. ANSWER: TRUE 13.6 A network is a graphical display of a project that contains both activities and events. ANSWER: TRUE 13.7 The optimistic time is the greatest amount of time that could be required to complete an activity. ANSWER: FALSE 13.8 PERT is a network technique similar to CPM, but PERT allows for project crashing. ANSWER: FALSE 13.9 The most likely completion time of an activity is used to represent that activity’s time within a project. ANSWER: FALSE 13.10 The expected completion time and variance of an activity is approximated by the normal distribution in a PERT analysis. ANSWER: FALSE 13.11 PERT was developed for a project for which activity or task times were uncertain. ANSWER: TRUE 13.12 CPM was developed for use in managing projects which are repeated and about which we have good information as to activity or task completion times.
Written for
Document information
- Uploaded on
- September 8, 2021
- Number of pages
- 39
- Written in
- 2021/2022
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
final exam |elaborated| proj430 advanced project management pert and cpm are quantitative analysis tools designed to schedule and control large projects answer true 132 pert is a deterministi