• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 37 pages
Exam (elaborations)

CTS 1120 Exam Prep Comprehensive Resource To Help You Ace Exams Includes Frequently Tested Questions With Elaborated 100% Correct Complete Solutions Guaranteed Pass First Attempt!! Current Update!!

Document preview thumbnail
Preview 4 out of 37 pages

CTS 1120 Exam Prep Comprehensive Resource To Help You Ace Exams Includes Frequently Tested Questions With Elaborated 100% Correct Complete Solutions Guaranteed Pass First Attempt!! Current Update!! 1. What are the four teams that comprise the overall Project Team? - CORRECT ANSWER Owner, Design, Installation, and Management 2. Who would belong to the Design team? - CORRECT ANSWER Anyone with Consultant in their title except the moving consultant 3. Which groups make up the Management Team? - CORRECT ANSWER Developer, Construction Manager, and Building Management Agency 4. The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - CORRECT ANSWER Owner 5. Which group represent the generic roles that are important to the Project process? - CORRECT ANSWER Project Managers, Designers and Installers 6. Which project characteristics must be considered in order to determine which method is best suited for a particular project? - CORRECT ANSWER Schedule, Size, Type, Complexity, and Procurement Requirements 7. What is an important aspect of funding that has a direct impact on the project process and design/installation? - CORRECT ANSWER Technical Support Funding 8. Whether a construction project is large or small, which milestones must be achieved in a typical schedule? - CORRECT ANSWER Programming, Building Design, AV Bid, and Move-In 9. What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - CORRECT ANSWER Long term projects with extended project cycles 10. What is the risk in using an OFE/Integrator Installed contract structure? - CORRECT ANSWER System and infrastructure design and facility functionality may suffer

Content preview

CTS 1120 Exam Prep Comprehensive Resource To Help You
Ace 2026-2027 Exams Includes Frequently Tested Questions
With Elaborated 100% Correct Complete Solutions

Guaranteed Pass First Attempt!! Current Update!!



1. What are the four teams that comprise the overall Project Team? - CORRECT
ANSWER Owner, Design, Installation, and Management


2. Who would belong to the Design team? - CORRECT ANSWER Anyone with
Consultant in their title except the moving consultant


3. Which groups make up the Management Team? - CORRECT ANSWER
Developer, Construction Manager, and Building Management Agency


4. The End-User, Facility Manager and Building Committee comprise which
team within the Project Team? - CORRECT ANSWER Owner


5. Which group represent the generic roles that are important to the Project
process? - CORRECT ANSWER Project Managers, Designers and Installers


6. Which project characteristics must be considered in order to determine
which method is best suited for a particular project? - CORRECT ANSWER
Schedule, Size, Type, Complexity, and Procurement Requirements

,7. What is an important aspect of funding that has a direct impact on the
project process and design/installation? - CORRECT ANSWER Technical
Support Funding


8. Whether a construction project is large or small, which milestones must be
achieved in a typical schedule? - CORRECT ANSWER Programming, Building
Design, AV Bid, and Move-In


9. What type of project is a typical Consultant-Led Design-Bid-Build contract
structure good for? - CORRECT ANSWER Long term projects with extended
project cycles


10.What is the risk in using an OFE/Integrator Installed contract structure? -
CORRECT ANSWER System and infrastructure design and facility
functionality may suffer


11.What are some of the important project scope and size considerations in
selecting an AV provider? - CORRECT ANSWER Financial Stability, Current
Workload, and Company Credentials


12.What type of document typically includes Project Size Requirements,
Corporate Profile, Team Personnel, and Warranty Response Time? -
CORRECT ANSWER RFQ


13.a significant difference between the Two-Envelope Bid
14.Method and the Qualifications- Based Selection Method? - CORRECT
ANSWER Negotiate with the highest ranking firm to finalize the contract

,15.What is one of the disadvantages of contracting the AV integrator to the
electrical
16.subcontractor? - CORRECT ANSWER More layers of responsibility and
communication


17.When conducting a complete project bid process, what milestone follows
the issuing of the RFP? - CORRECT ANSWER Pre-Bid Meeting


18.Under what circumstances would you likely use an A305-1986 form? -
CORRECT ANSWER Scoring responses to an RFQ


19.What is the ideal way to contract an AV integrator? - CORRECT ANSWER
Directly to the Owner


20.The process of identifying the activities that end-users need to perform, and
developing the functional descriptions of your systems is referred to as:? -
CORRECT ANSWER Needs Analysis


21.What is the main task of the third Step of the Program Phase of a Project? -
CORRECT ANSWER Conducting program meetings


22.What should be included in the written Program Report? - CORRECT
ANSWER ...A conceptual and functional system description

, 23.The more accurate means to estimate dimensions of a commercial space
during a site inspection would be to? - CORRECT ANSWER Count Ceiling
Tiles in a drop tile instalation


24.A client requires a new boardroom. The sales person and engineer are sent
to the premises to measure the facility and talk to the client. At this stage
they should be performing a _ - CORRECT ANSWER Needs Analysis


25.Sightlines for audience viewing in a given presentation space can be
improved by: - CORRECT ANSWER Providing a sloped, or stepped, seating
arrangement


26.After presenting a proposal, what is the correct plan of action for following
up with the client? - CORRECT ANSWER Regularly, until a decision is made


27.AV professionals determine the end user's needs by examining three things:
the required applications, the tasks, and the: - CORRECT ANSWER Functions
to support the applications


28.When working with a client to design an AV solution for a new conference
center, the client requests a detailed budget for the equipment and
installation. What phase is the project in? - CORRECT ANSWER Design phase


29.The HDTV aspect ratio is equal to which of the following? - CORRECT
ANSWER 1.78:1

Document information

Uploaded on
October 23, 2026
Number of pages
37
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EWLindy
3.8
(116)
Sold
780
Followers
432
Items
8898
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions