Question:
1. Estimating
Answer:
Determination of the probable cost for a project
Question:
2. Probable
Answer:
Changes could be made
Question:
3. Unforeseen conditions
Answer:
Cost fluctuation and labor cost
Question:
4. Prepared from the construction documents
Answer:
Plans (working drawings)
Question:
5. Project manual
Answer:
Nothing is ever exact in estimating
Question:
6. Estimates are used to
Answer:
Establish product budgets
Question:
7. Develop schedules
Answer:
Productivity rates
, Question:
8. How long it takes to complete task
Answer:
By the quantity of materials
Question:
9. Order materials
Answer:
May not be exact, only an estimate
Question:
10. Profit margin
Answer:
Provides the contractor with an acceptable rate of return and compensation for the risk
associated with the project
Question:
11. Gross margin
Answer:
Before and deductions have been taken out
Question:
12. Estimating effort vs accuracy
Answer:
NOT SOURCE-VERIFIED — REVIEW REQUIRED: The study term or label is "Estimating
effort vs accuracy". Its definition or intended question is not sufficiently specified in the
source to produce a verified answer; check the relevant course glossary or diagram.
Question:
13. Project comparison
Answer:
Comparing a proposed project to a similar project that has been completed
TYPES Questions with Correct Solutions
Question:
1. Estimating
Answer:
Determination of the probable cost for a project
Question:
2. Probable
Answer:
Changes could be made
Question:
3. Unforeseen conditions
Answer:
Cost fluctuation and labor cost
Question:
4. Prepared from the construction documents
Answer:
Plans (working drawings)
Question:
5. Project manual
Answer:
Nothing is ever exact in estimating
Question:
6. Estimates are used to
Answer:
Establish product budgets
Question:
7. Develop schedules
Answer:
Productivity rates
, Question:
8. How long it takes to complete task
Answer:
By the quantity of materials
Question:
9. Order materials
Answer:
May not be exact, only an estimate
Question:
10. Profit margin
Answer:
Provides the contractor with an acceptable rate of return and compensation for the risk
associated with the project
Question:
11. Gross margin
Answer:
Before and deductions have been taken out
Question:
12. Estimating effort vs accuracy
Answer:
NOT SOURCE-VERIFIED — REVIEW REQUIRED: The study term or label is "Estimating
effort vs accuracy". Its definition or intended question is not sufficiently specified in the
source to produce a verified answer; check the relevant course glossary or diagram.
Question:
13. Project comparison
Answer:
Comparing a proposed project to a similar project that has been completed