DBIA Practice Exam Latest 2026/2027 Questions and Correct Detailed Answers Already Graded A+

Document preview thumbnail
Preview 3 out of 21 pages

DBIA Practice Exam Latest 2026/2027 Questions and Correct Detailed Answers Already Graded A+

Content preview

DBIA Practice Exam Latest 2026/2027 Questions
and Correct Detailed Answers Already Graded
A+



instead of government building and maintaining major infrastructure (such as
highway, water treatment plant), build and maintenance is outsourced to a
private company. Opposed by public sector unions. this is not considered a
delivery system but its underlying approaches are delivery systems and typically
use DB. multiple procurement and contracting approaches - CORRECT
ANSWER-Public-Private-Partnership




Intense efforts to establish scope early in the process; drives early team formation
to include key trade subcontractors; can enable big decisions to be made early,
affect project outcomes at lower cost, establish a need for location and
collaboration, and compress times during concurrent design and construction -
CORRECT ANSWER-shift left




Typically two-phase best value procurement with lump sum contract; owner
defines project requirements and scope of prescriptive work; use of performance-
based technical requirements with limited perspective specifications - CORRECT
ANSWER-traditional design build

,design and procurement are progressively developed after the design-builder is
under contract; final project cost and schedule commitment is not established as
part of the selection process; two phases; preliminary services and final design
and construction services - CORRECT ANSWER-Progressive design build



What documents describe the end result - CORRECT ANSWER-Criteria
documents



Prescribes how to achieve the end result - CORRECT ANSWER-Bridging
Documents



Prior to bidding, owner undertakes a process to design the project and all of its
details to 100% complete plans and specs. The owner is therefore responsible for
success or failure of details of the design, and warrants the sufficiency of design
to the contractor. The owner is therefore liable to the contractor for any gaps
between plans and specs and owner's requirements for project performance -
CORRECT ANSWER-Design bid build paradigm




The owner should define its performance requirements and award the contract
on the basis of preliminary design; this makes the design-builder responsible for
completing the design in accordance with the owner's performance
requirements. That also causes the design-builder to warrant the sufficiency of
the design to meet the owner's criteria and the sufficiency of the design to

, subcontractors/suppliers that have no design responsibility - CORRECT
ANSWER-Design details responsibility

How team members are organized, establishes when parties engage, determines
roles of parties, and determines sequence of design, procurement, and
construction (db, cmar, dbb) - CORRECT ANSWER-Project Delivery system



How team members are selected (QBS, best value, low price, sole source) -
CORRECT ANSWER-Procurement Method




How team members are paid (FP, gmp, cost reimbursement, target price, unit
price) - CORRECT ANSWER-Contracting approach



linear, sequential process, A/E selected on qualifications, GC selected on low
price, design is fully completed without input from GC, A/E acting in owner's
interests, with a historically strong bond, process is well-established and
understood - CORRECT ANSWER-Design-Bid-Build



Similar structure to DBB, construction manager selected by QBS or best value,
contractor provides precon services, negotiated gmp contracting approach, open
book estimating process, potential to fast track project, construction cost
determined before design completed, potential issues over what is reasonably
inferable from gmp design documents. - CORRECT ANSWER-CM@Risk

Document information

Uploaded on
October 21, 2026
Number of pages
21
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$23.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
emilywambura
3.8
(15)
Sold
63
Followers
12
Items
6319
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions