• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

Cm 3111 Chapter 1 Exam Questions With Verified Answers Latest Update 2026

Document preview thumbnail
Preview 1 out of 3 pages

CM 3111 CHAPTER 1 EXAM QUESTIONS WITH VERIFIED ANSWERS LATEST UPDATE 2026 building construction estimating - Answers the determination of probable construction costs of any given project working drawings - Answers the _____ _____ usually contain information relative to the design, location, dimensions, and construction of the project project manual - Answers the _____ _____ is a written supplement to the drawings and includes information pertaining to materials and workmanship, as well as information about the bidding process profit margin - Answers provides the general contractor an acceptable rate of return and compensation for the risk associated with the project indirect - Answers __________ field costs are also referred to as general conditions or project overhead costs in building construction direct - Answers __________ field costs are the material, labor, equipment, or subcontracted items that are permanently and physically integrated into the building detailed estimate - Answers includes determination of the quantities and costs of everything that is required to complete the project. this includes materials, labor, equipment, insurance, bonds, and overhead, as well as an estimate of the profit. assembly - Answers in __________ estimating, rather than bidding each of the individual components of the project, the estimator bids the components in groups known as assemblies square-footage estimates - Answers are prepared by multiplying the square footage of a building by a cost per square foot and then adjusting the price to compensate for differences in the buildings heights, length of the building perimeters, and other building components parametric estimates - Answers use equations that express the statistical relationship between building parameters and the cost of the building model estimating - Answers uses computer models to prepare an estimate based on a number of questions answered by the estimator project comparison estimates - Answers are prepared by comparing the cost of a proposed project to a completed project architectural - Answers the __________ office will require estimates at three design stages: preliminary, cost evaluation during drawing preparation, and a final estimate.

Content preview

CM 3111 CHAPTER 1 EXAM QUESTIONS WITH VERIFIED ANSWERS
LATEST UPDATE 2026


building construction estimating - Answers the determination of probable
construction costs of any given project
working drawings - Answers the _____ _____ usually contain information relative to
the design, location, dimensions, and construction of the project
project manual - Answers the _____ _____ is a written supplement to the drawings
and includes information pertaining to materials and workmanship, as well as
information about the bidding process
profit margin - Answers provides the general contractor an acceptable rate of return
and compensation for the risk associated with the project
indirect - Answers __________ field costs are also referred to as general conditions
or project overhead costs in building construction
direct - Answers __________ field costs are the material, labor, equipment, or
subcontracted items that are permanently and physically integrated into the building
detailed estimate - Answers includes determination of the quantities and costs of
everything that is required to complete the project. this includes materials, labor,
equipment, insurance, bonds, and overhead, as well as an estimate of the profit.
assembly - Answers in __________ estimating, rather than bidding each of the
individual components of the project, the estimator bids the components in groups
known as assemblies
square-footage estimates - Answers are prepared by multiplying the square footage of
a building by a cost per square foot and then adjusting the price to compensate for
differences in the buildings heights, length of the building perimeters, and other
building components
parametric estimates - Answers use equations that express the statistical relationship
between building parameters and the cost of the building
model estimating - Answers uses computer models to prepare an estimate based on a
number of questions answered by the estimator
project comparison estimates - Answers are prepared by comparing the cost of a
proposed project to a completed project
architectural - Answers the __________ office will require estimates at three design
stages: preliminary, cost evaluation during drawing preparation, and a final estimate.

Document information

Uploaded on
October 20, 2026
Number of pages
3
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.5
(77)
Sold
508
Followers
16
Items
33094
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions