AFSB 152 COMPREHENSIVE QUESTIONS
AND SOLUTIONS


◉ Surety
Answer: The party, usually an insurer, that guarantees the
principal's obligation.


◉ Principal
Answer: The party whose obligation or performance is
guaranteed; usually the contractor.


◉ Obligee
Answer: The party protected by the surety bond; usually the
project owner.


◉ Suretyship
Answer: The obligation to answer for another party's debt,
default, or failure to perform.


◉ Contract bond
Answer: A surety bond guaranteeing obligations under a
construction or other contract.

,◉ Bid bond
Answer: Guarantees that the bidder will sign the contract and
provide required final bonds if awarded the job.


◉ Performance bond
Answer: Guarantees completion of the contract according to its
terms.


◉ Payment bond
Answer: Guarantees payment to covered laborers, subcontractors,
and suppliers.


◉ Maintenance bond
Answer: Guarantees correction of defective work during a
maintenance or warranty period.


◉ Supply contract bond
Answer: Guarantees that a supplier will perform a supply contract
according to specifications.


◉ Design/build
Answer: A construction method where one contractor provides
both design and construction services.


◉ Subcontractor

, Answer: An independent contractor hired by a general contractor
to perform a specific portion of work.


◉ Material supplier
Answer: A manufacturer or distributor that sells construction
materials or equipment.


◉ Mobilization
Answer: Preconstruction activities such as moving equipment,
setting up field offices, and installing temporary utilities.


◉ Critical path method (CPM)
Answer: A scheduling method identifying major project activities
and their sequence for timely completion.


◉ Punch list
Answer: A list of small finishing or corrective tasks remaining
near substantial completion.


◉ Change order
Answer: Written approval from the owner and architect
modifying contract scope, price, time, or substance.


◉ Retainage

Document information

Uploaded on
October 20, 2026
Number of pages
20
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(18)
Sold
210
Followers
7
Items
64373
Last sold
19 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions