Conventional concrete typically weighs ____________ - Answer 140pcf - 150pcf BTU - Answer British Thermal Unit - A quantity of heat. It is the amount of heat needed to raise a pound of water 1°F. An MBH is 1,000 BTUs/hr. Sensible Heat - Answer "Dry Heat" - Heat added to the air without adding moisture. As sensible heat increases the points on the psychrometric chart move to the right. Latent Heat - Answer The hidden heat added to the air by adding moisture (approx. 1,000 BTUs/lb of water). As latent heat increases the points on the psychrometric chart move up. Enthalpy - Answer (h) - is the total amount of thermal energy (sensible & latent) in the air. It is measured in BTUs per lb of dry air. Depreciable value is the purchase price less the __________ - Answer Salvage Value The difference between a current asset and a long term asset is ______________ - Answer Current assets can be liquidated within one year and long term assets cannot Current Ratio - Answer This accounting ratio is calculated by dividing the total current assets by the total current liabilities Working capital of a construction company increases when - Answer A company sells equipment or assets When an owner decides to add additional work to the original scope, this is considered what type of change? - Answer Owner Directed Change Order All of the following are steps that a construction company can follow in applying risk management except one. - Answer Avoid all risky situations. Complete the risk statement...if a/an _______________ happens, then the steel material for the project may cost more than the budget, which will impact the stele subcontractors, causing an increase in the project cost. - Answer Fluctuation in the steel price.

Content preview

LSU CM Exit- Exam and All Correct
Answers 2026.
Conventional concrete typically weighs ____________ - Answer 140pcf - 150pcf



BTU - Answer British Thermal Unit - A quantity of heat. It is the amount of heat needed to
raise a pound of water 1°F. An MBH is 1,000 BTUs/hr.



Sensible Heat - Answer "Dry Heat" - Heat added to the air without adding moisture. As
sensible heat increases the points on the psychrometric chart move to the right.



Latent Heat - Answer The hidden heat added to the air by adding moisture (approx. 1,000
BTUs/lb of water). As latent heat increases the points on the psychrometric chart move up.



Enthalpy - Answer (h) - is the total amount of thermal energy (sensible & latent) in the air. It is
measured in BTUs per lb of dry air.



Depreciable value is the purchase price less the __________ - Answer Salvage Value



The difference between a current asset and a long term asset is ______________ - Answer
Current assets can be liquidated within one year and long term assets cannot



Current Ratio - Answer This accounting ratio is calculated by dividing the total current assets
by the total current liabilities



Working capital of a construction company increases when - Answer A company sells
equipment or assets



When an owner decides to add additional work to the original scope, this is considered what
type of change? - Answer Owner Directed Change Order



All of the following are steps that a construction company can follow in applying risk
management except one. - Answer Avoid all risky situations.



Complete the risk statement...if a/an _______________ happens, then the steel material for the
project may cost more than the budget, which will impact the stele subcontractors, causing an
increase in the project cost. - Answer Fluctuation in the steel price.

, Which of the following best describes risk? - Answer The potential event that results in an
outcome that is different than what's planned.



Typical steps associated with the risk management process are identify the risk, analyze the
identified risks, _____________, allocate risks contractually, and monitor and control risks
throughout the design and construction of a project. - Answer Mitigate and plan to address
risks.



Which of the following is not a risk identification tool and technique that construction managers
use. - Answer Value Engineering



Change Order - Answer A written order to the contractor authorizing changes in work to the
signed original documents (not the bid documents)



An acceptance is ______________________________. - Answer An unconditional agreement
with an offer



What is the constructive acceleration? - Answer It is the forced completion of the contract
work in a shorter period than should have been allowed by the issuance of a warranted time
extension.



What is the cardinal rule of documentation and records? - Answer Put it in writing.



Which one of the following is NOT an alternative dispute resolution method? - Answer
Litigation



__________________ is a sum withheld from progress payments to the contractor in
accordance with the terms of

the contract - Answer Retainage (retention)



Define progress curves. - Answer A display of cumulative costs, labor hours, or other
quantities against time as s-curves.



From the following list, which tool does not help a project manager to control costs on a
project? - Answer Baseline schedules



If a project that is 40% complete has a cost variance of -$45,000, what does this mean? -
Answer The project is currently $45,000 over-budget

Document information

Uploaded on
October 19, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
COCOSOLUTIONS
4.1
(39)
Sold
235
Followers
16
Items
9864
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions