What is Estimating? - Answer Determine the forecast costs required to complete a project in accordance with the plans and specifications. Direct costs - Answer (material, labor, equipment) Overhead - Answer (indirect costs required to build project) Contingencies - Answer (costs for potential unforeseen work) Profit - Answer (compensation for work being performed) Cost estimating is both an art and a science - Answer Common Sense Experience Intuition Judgment overhead - Answer Anything that is not permanent materials, labor, or equipment Job Overhead - Cost associated with a specific project (staff salaries, utilities, supplies, office rental, permits, insurance, etc.) General Overhead - Costs incurred by the general (main) office (office space, staff, utilities, etc.) Insurance - Answer Workers Compensation - Covers medical expenses and lost wages during period of injury. Varies by location Builders Risk - Covers the project that is being constructed from fire, lightning strike, etc. Can be expanded to cover wind, smoke, explosion, and vandalism. Public Liability and Property Damage - Covers actions of the contractor while performing at the jobsite that cause damage to the public or public property Others... Why not bid on all projects? - Answer Contractors invest time and money on bids

Content preview

CM-Exam-Construction Estimating
Questions with All Detailed Answers
2026-2027 Updated.
What is Estimating? - Answer Determine the forecast costs required to complete a project in
accordance with the plans and specifications.



Direct costs - Answer (material, labor, equipment)



Overhead - Answer (indirect costs required to build project)



Contingencies - Answer (costs for potential unforeseen work)



Profit - Answer (compensation for work being performed)



Cost estimating is both an art and a science - Answer Common Sense Experience Intuition
Judgment



overhead - Answer Anything that is not permanent materials, labor, or equipment

Job Overhead - Cost associated with a specific project (staff salaries, utilities, supplies, office
rental, permits, insurance, etc.)



General Overhead - Costs incurred by the general (main) office (office space, staff, utilities, etc.)



Insurance - Answer Workers Compensation - Covers medical expenses and lost wages during
period of injury. Varies by location



Builders Risk - Covers the project that is being constructed from fire, lightning strike, etc. Can be
expanded to cover wind, smoke, explosion, and vandalism.



Public Liability and Property Damage - Covers actions of the contractor while performing at the
jobsite that cause damage to the public or public property



Others...



Why not bid on all projects? - Answer Contractors invest time and money on bids

,Probability of winning the bid and making a profit



Need to maintain a presence



Risk of winning the project



Factors Affecting Decision to Bid - Answer • Skills and availability of labor and equipment

• Level of experience with project type

• Bonding capacity

• Geographic location

• Complexity

• Owner/designer reputation

• Available working capital

• Desire to expand operations

• Desire to gain expertise



Kick-Off Meeting - Answer Just like with any project, you want to make sure everyone on the
team has a clear understanding of

• the expectations of the team

• what the "customer" wants (either outside customer or management team)

• individual responsibilities

• the work to be accomplished



Methods and Techniques of Estimates - Answer Methods used to develop estimate are a
function of

• Level of scope definition

• Time allowed

• Level of accuracy

• Intended use of estimate



Contingency - Answer Percentage of Base Estimate (Very Simple, but less accurate)



Expected net Risk - Answer Procedure

1. Identify a max cost for each item.

, 2. Calculate the difference between max cost and base cost...the maximum risk.

3. Establish a percentage probability of each risk occurring

4. Calculate the expected net risk of each item, which is the maximum risk times the percentage
probability

5. The total expected net risk is your contingency



Estimate Quality - Answer The quality of an estimate is a function of:



• Quality and amount of information provided to prepare the estimate

• Time allocated to prepare the estimate

• Proficiency of the estimator and estimating team

• Tools and techniques used in preparing the estimate

• Quality of the plan and management (control) of

estimating process...quality of lead estimator



Contractor - Answer A person or company that undertakes a contract to provide materials or
labor to perform a service or do a job



Typical Bidding Documents - Answer Design Drawings (Blueprints)

•Design Specifications (CSI Div. 01 -49) & Industry

Standards by Reference

•Bid Manual (CSI Div. 00 & 01)



Design Drawings - Answer Plan View (A view of an object as projected onto a horizontal
plane.)



Elevations (Whole side of building/ horizontal cutout)



Sections (Full vertical cut right down a section of the object)



Example of Bidding Requirements - Answer Bid Solicitation (Invitation to Bid)

Instructions to Bidders

Description of Work (Scope of Work)

Information Available to Bidder

Bid Form (lump sum or unit price)

Etc.

Document information

Uploaded on
October 19, 2026
Number of pages
22
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
COCOSOLUTIONS
4.1
(39)
Sold
235
Followers
16
Items
9864
Last sold
5 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions