• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 147 pages
Exam (elaborations)

Virginia Class A Contractor Exam Practice Questions And Rationale Study Guide 2026

Document preview thumbnail
Preview 4 out of 147 pages

Secure your elite credentials on the first try with this definitive 2026 licensing resource packed with original practice questions and comprehensive answer breakdowns. This targeted preparation guide provides exhaustive coverage of Virginia business law, DPOR regulations, worker safety codes, liability management, and state contract rules. Designed specifically for construction professionals, this study package details the clinical rationale behind every correct choice to ensure you master the rules, pass your PSI exam, and grow your business.

Content preview

VIRGINIA CLASS A CONTRACTOR EXAM Practice
Questions with Detailed Rationales 3 Versions

Complete Study Guide for 2026




EXAM OVERVIEW

Feature Details


Administering Agency Virginia Board for Contractors (DPOR)


Exam Provider PSI


Format Multiple-choice, open-book


Virginia Portion 24 items; 18 pass; 48 minutes


General Portion 50 items; 35 pass; 100 minutes


Advanced Portion 24 items; 17 pass; 60 minutes


Reference Materials NASCLA Guide, USBC, IRC, OSHA 1926

,Question 1
Under the amended Board for Contractors Regulations effective September 1, 2025,
what is the minimum experience requirement for a qualified individual seeking a Class C
contractor license?

A) Two years
B) One year
C) Three years
D) Six months

Answer: B) One year
Rationale: The amendments to 18VAC50-22-40 reduce the experience requirement for a
Class C contractor license applicant to one year in the classification or specialty service for
which licensure is sought, instead of the previous two-year requirement.




Question 2
What is the current maximum payment limit from the Virginia Contractor Transaction
Recovery Fund per claimant?

A) $20,000
B) $25,000
C) $30,000
D) $50,000

**Answer: C) $30,000***
*Rationale: Recent amendments to the Virginia Contractor Transaction Recovery Act
increased the recovery fund payment limits from $20,000 to $30,000 per claimant.




Question 3
What is the maximum penalty per day for a contractor who undertakes work without the
proper class of license in Virginia?

A) $250
B) $500
C) $1,000
D) $2,500

,**Answer: B) $500***
*Rationale: Under Virginia law, a contractor who undertakes work without the proper class
of license may be assessed a $500 fine per day for each day of violation, plus penalties for
a misdemeanor.




Question 4
What is the primary purpose of contractor licensing in Virginia?

A) To increase state revenue
B) To protect the health and welfare of the public
C) To limit competition
D) To standardize construction costs

Answer: B) To protect the health and welfare of the public
Rationale: The primary purpose of contractor licensing in Virginia is to protect the health
and welfare of the public by ensuring that contractors meet minimum standards of
competency and responsibility.




Question 5
What must all Class A contractor licensure applications include?

A) A business plan
B) Information on the knowledge, skills, and abilities of the applicant
C) A list of all past projects
D) A credit report

Answer: B) Information on the knowledge, skills, and abilities of the applicant
Rationale: All Class A contractor licensure applications must include information on the
knowledge, skills, and abilities of the applicant to demonstrate qualification for licensure.

, Question 6
When a claimant is paid funds from the Contractors Recovery Trust Fund, what happens
to the contractor's license?

A) It is automatically renewed
B) It is suspended until the fund is repaid
C) It is permanently revoked
D) No action is taken

Answer: B) It is suspended until the fund is repaid
Rationale: When a claimant is paid funds from the Contractors Recovery Trust Fund, the
contractor's license is suspended until the contractor repays the fund. This ensures
accountability and protects future claimants.




Question 7
A contractor's financial statement shows a current ratio of 1.2 and a quick ratio of 0.8.
Which of the following actions would most likely improve the quick ratio without
harming the current ratio?

A) Purchasing inventory on credit
B) Selling inventory for cash
C) Taking out a short-term loan
D) Delaying payment to suppliers

Answer: B) Selling inventory for cash
Rationale: The quick ratio excludes inventory from current assets. Selling inventory for
cash converts inventory into cash, which increases the numerator of the quick ratio
(current assets minus inventory) while keeping total current assets the same, thereby
improving the quick ratio without harming the current ratio.




Question 8
Given the following information, what is the firm's debt-to-equity ratio?
Total liabilities: $230,000
Total equity: $150,000

Document information

Uploaded on
October 16, 2026
Number of pages
147
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$33.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CornelWest
3.7
(267)
Sold
1663
Followers
1131
Items
13726
Last sold
6 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions