Preview 4 out of 148 pages
Exam (elaborations)

Virginia Class A Contractor Exam Original Practice Questions Study Guide

Document preview thumbnail
Preview 4 out of 148 pages

Pass your licensing assessment on the first attempt with this comprehensive study resource containing original practice questions modeled after the official state exam. This targeted preparation pack thoroughly covers critical state regulations, statutes, risk management, bidding, and contract practices specific to the Commonwealth of Virginia. Designed for professionals and tradespeople seeking their top-tier credential, these practice sets ensure you master business law, safety guidelines, and board rules to confidently pass your exam and scale your contracting business.

Content preview

Virginia Class A Contractor Exam
Original Practice Questions 2 versions


1. A contractor is reviewing contract documents for a commercial
project. Which document typically defines the scope of work, contract
sum, and time for completion?

A. The project manual

B. The agreement between owner and contractor

C. The general conditions

D. The technical specifications

B. The agreement between owner and contractor

The agreement (contract) is the primary document that defines the scope of
work, contract sum, time for completion, and the respective rights and
obligations of the parties. The project manual contains the bidding
documents, general conditions, and specifications, but the agreement itself is
the binding contract.




2. Which type of contract places the greatest risk on the contractor for
cost overruns?

A. Cost-plus-fee contract

B. Unit price contract

,C. Lump sum (fixed price) contract

D. Time and materials contract

C. Lump sum (fixed price) contract

In a lump sum contract, the contractor agrees to complete the work for a
fixed price regardless of actual costs. If costs exceed the contract sum, the
contractor absorbs the loss. Cost-plus and time-and-materials contracts pass
cost risk to the owner.




3. A contractor discovers that the plans and specifications contain a
discrepancy between the drawings and the written specifications.
What is the correct course of action?

A. Proceed with the less expensive option

B. Request clarification from the architect/engineer before proceeding

C. Proceed with the drawings since they take precedence

D. Proceed with the specifications since they take precedence

B. Request clarification from the architect/engineer before proceeding

When a discrepancy exists, the contractor should request clarification through
a formal Request for Information (RFI). Proceeding without clarification may
result in performing work that does not comply with the contract documents.




4. In construction estimating, what is the purpose of a quantity
takeoff?

A. To calculate the total contract price

,B. To determine the quantities of materials and labor required for each
work item

C. To establish the project schedule

D. To determine the contractor's overhead and profit

B. To determine the quantities of materials and labor required for each
work item

A quantity takeoff is the process of measuring and listing the quantities of
materials, labor, and equipment required for each component of the work. It
forms the basis for pricing the estimate.




5. What is the difference between direct costs and indirect costs in a
construction estimate?

A. Direct costs are labor and materials; indirect costs are overhead and
profit

B. Direct costs are overhead; indirect costs are materials

C. Direct costs are profit; indirect costs are labor

D. There is no difference

A. Direct costs are labor and materials; indirect costs are overhead and
profit

Direct costs are those directly attributable to the work, such as labor,
materials, and equipment. Indirect costs (also called overhead) include
general conditions, home office overhead, and profit.

, 6. Which of the following is considered a general condition cost in a
construction estimate?

A. Concrete materials

B. Temporary power and site supervision

C. Structural steel

D. Roofing labor

B. Temporary power and site supervision

General conditions (also called general requirements) include project
management, temporary facilities, site supervision, temporary power and
water, and other costs required to support the work but not part of the
permanent construction.




7. What is the purpose of a contingency in a construction estimate?

A. To cover the contractor's profit

B. To cover unforeseen conditions or changes in scope

C. To pay for subcontractor markups

D. To cover the cost of permits

B. To cover unforeseen conditions or changes in scope

A contingency is an allowance included in the estimate to cover unexpected
conditions, minor changes, or price escalation. It is not a profit center but a
risk management tool.

Document information

Uploaded on
October 16, 2026
Number of pages
148
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$33.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CornelWest
3.7
(267)
Sold
1663
Followers
1131
Items
13726
Last sold
6 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions