What is the exceedance trigger for Receiving Water Monitoring?
a. 100 NTU
b. 250 NTU
c. 500 NTU
d. 1,000 NTU -ANSWER-C
What system that uses chemical coagulation, chemical flocculation, or
electro-coagulation to reduce turbidity?
a. ATS
b. CGP
c. CWA
d. NAL -ANSWER-A
If the R Factor is ____, you can apply for the Erosivity Waiver.
a. 1
b. Less than 1
c. 5
d. Less than 5 -ANSWER-D
, The R factor accounts for:
a. Project location, length of construction period, and time of year
b. Project schedule
c. Historical rain events
d. Potential pollutants on site -ANSWER-A
Which risk level must electronically submit all storm event sampling
results to State Water Board no later than 5 days after the conclusion of
the storm event?
a. Risk Level 1
b. Risk Level 2
c. Risk Level 3
d. All Risk Levels -ANSWER-C
Which statement is true? Risk Level 2 sites:
a. Are subject to all Risk Level 3 requirements
b. Must electronically submit all NAL exceedance storm event sampling
results to State Water Board no later than 10 days after the storm
event
c. Have 10 categories of year-round minimum BMP's