• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 128 pages
Exam (elaborations)

Georgia Low-Voltage Contractor LV-A Exam Prep: Alarm & General Systems Practice Questions & Code Rationales

Document preview thumbnail
Preview 4 out of 128 pages

This specialized professional preparation resource delivers high-yield practice questions, verified answers, and comprehensive regulatory rationales tailored specifically for the Georgia Low-Voltage Contractor Class LV-A (Alarm and General Systems) examination. It provides exhaustive coverage of the National Electrical Code (NEC Article 725 and related signaling standards), Georgia Construction Industry Licensing Board regulations under the Secretary of State, burglary/fire alarm circuit requirements, and job-site safety compliance. Licensure candidates will master restricted scope boundaries, power-limited system parameters, and diagnostic troubleshooting to comfortably achieve the 70% passing threshold required for state certification.

Content preview

Georgia Low-Voltage Contractor LV-A Exam Prep:
Alarm & General Systems Practice Questions & Code
Rationales 2026



This specialized professional preparation resource delivers high-yield practice
questions, verified answers, and comprehensive regulatory rationales tailored
specifically for the Georgia Low-Voltage Contractor Class LV-A (Alarm and General
Systems) examination. It provides exhaustive coverage of the National Electrical Code
(NEC Article 725 and related signaling standards), Georgia Construction Industry
Licensing Board regulations under the Secretary of State, burglary/fire alarm circuit
requirements, and job-site safety compliance. Licensure candidates will master
restricted scope boundaries, power-limited system parameters, and diagnostic
troubleshooting to comfortably achieve the 70% passing threshold required for state
certification



1. Which Georgia administrative rule contains the specific requirements for the
Statewide Low-Voltage Contractor License?

A. Rule 121-1-.01
B. Rule 121-3-.06
C. Rule 295-2-.02
D. Rule 121-2-.03

B. Rule 121-3-.06

Ga. Comp. R. & Regs. R. 121-3-.06 is the specific rule titled "Statewide Low-Voltage
Contractor License" and contains the classification restrictions, examination requirements,
and experience prerequisites for LV-A licensure.




2. What is the maximum amount of experience credit an applicant may receive for
completing electronics courses through a technical trade school?

A. Three months
B. Six months

,C. Nine months
D. Twelve months

B. Six months

Under Ga. Comp. R. & Regs. R. 121-3-.06(4), completion of electronics courses through a
school of engineering technology or technical trade school is credited as experience
equivalent to actual instructional time, up to a maximum of six (6) months.




3. A person applying for an LV-A license must have at least one year of experience
in which specific category?

A. Any electrical wiring
B. Alarm system low-voltage wiring
C. Telecommunications wiring
D. General system wiring

B. Alarm system low-voltage wiring

The rule requires one year of experience "in low-voltage wiring in the license category for
which the applicant is applying." For LV-A (alarm and general system), the experience
must be in alarm system low-voltage wiring.




4. Which document must accompany the low-voltage contractor application to
verify an applicant's work experience?

A. A notarized letter from any employer
B. Reference forms from three persons, at least one of whom is a licensed low-voltage
contractor
C. A copy of a high school diploma
D. A certificate of insurance

B. Reference forms from three persons, at least one of whom is a licensed low-
voltage contractor

,The application requires listing three persons with knowledge of the applicant's low-
voltage experience, and at least one reference must be a licensed low-voltage contractor
who submits the required Reference Form to the Board.




5. What happens if an applicant answers "YES" to having a license denied,
revoked, or suspended in another state?

A. The application is automatically rejected
B. No action is required
C. The applicant must submit a letter of explanation and certified copies of the action
taken
D. The applicant must wait five years before reapplying

C. The applicant must submit a letter of explanation and certified copies of the
action taken

The application instructions state that if the applicant answers YES to any question
regarding prior licensing actions, they must submit a letter of explanation and a certified
copy of the action taken against their license with relevant supporting documents.




6. Under Georgia law, what is prima-facie evidence of unlicensed low-voltage
contracting?

A. A customer complaint
B. Advertising or offering to perform low-voltage work without a license
C. Working on weekends
D. Using a vehicle with a company logo

B. Advertising or offering to perform low-voltage work without a license

O.C.G.A. § 43-14-9 provides that it is prima-facie evidence of a violation if any person not
licensed advertises, offers, bids, contracts, or performs low-voltage work for compensation.

, 7. Which Georgia Code section specifically prohibits engaging in alarm system
low-voltage contracting without a valid license?

A. O.C.G.A. § 43-14-5
B. O.C.G.A. § 43-14-6
C. O.C.G.A. § 43-14-9
D. O.C.G.A. § 43-14-2

C. O.C.G.A. § 43-14-9

O.C.G.A. § 43-14-9(b) states that no person shall engage in alarm system, general low
voltage system, or telecommunications system low voltage contracting unless such person
has a valid license issued by the division.




8. What is the composition of the Division of Low Voltage Contractors within the
State Construction Industry Licensing Board?

A. Three members
B. Five members
C. Seven members
D. Nine members

B. Five members

The Division of Low-Voltage Contractors consists of five members: one alarm system
contractor, one unrestricted contractor, one telecommunications contractor, one
professional electrical engineer, and one chief electrical inspector.




9. How does Georgia define "general low-voltage systems" for licensing purposes?

A. Only fire alarm systems
B. Any electrical systems other than alarm or telecommunication systems involving low-
voltage wiring
C. Only security systems
D. Only data cabling

Document information

Uploaded on
October 15, 2026
Number of pages
128
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$33.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CornelWest
3.7
(267)
Sold
1663
Followers
1131
Items
13726
Last sold
6 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions