1. Arizona ROC Licensing Laws & Contractor Scope (CR14/R-14 classification
boundaries, license display requirements, experience qualifications, permit
obligations, contract requirements, lien laws, prompt pay, bond and insurance
requirements)
2. Post Setting, Footings & Concrete (hole depth rules, concrete mix ratios,
gravel base for drainage, frost line considerations, soil type impacts,
compaction, plumb alignment)
3. Chain-Link Fence Systems (fabric gauge, mesh size, zinc coating classes,
tension bars, tension bands, brace bands, terminal posts, line posts, top rail,
tension wire, selvage)
4. Wood Fencing Materials & Installation (pressure-treated lumber, cedar,
redwood, post spacing, rail attachment, picket styles, board-on-board,
shadowbox, fastener selection, decay prevention)
5. CMU Block Fencing & Masonry (mortar types S and N, rebar sizing and
spacing, cell grouting, stem wall foundations, movement joints, bond beams,
, cap blocks, pilasters, wall height limits)
6. Gates & Gate Hardware (swing gates, cantilever slide gates, hinges, latches,
drop rods, gate frames, automatic operators, ADA compliance, pool gate self-
closing requirements)
7. OSHA Construction Safety Standards (PPE for power tools, excavation and
trenching, power line clearances, lockout/tagout, hazard communication, SDS,
fall protection, silica exposure)
8. Property Lines, Easements & Zoning (survey requirements, setback
regulations, utility easements, 811/Blue Stake notification, height restrictions,
sight-distance triangles, encroachment liability)
9. Estimating, Bidding & Project Management (change orders, material takeoffs,
labor calculations, permit fees, schedule impacts, documentation
requirements, customer communication)
10. Material Selection & Corrosion Protection (galvanizing, powder coating,
stainless steel hardware, coastal and corrosive environment considerations,
vinyl and aluminum properties, ACQ/MCA treatment compatibility)
,Arizona Fencing Contractor License Exam
200 EXTREMELY DETAILED MULTIPLE CHOICE
QUESTIONS
Question 1
A CR14 fencing contractor in Arizona is preparing a bid for a residential project
valued at $7,500. The homeowner requests that the contractor begin work
immediately without a written contract because they are neighbors and trust
each other. Under Arizona contractor licensing regulations, what is the
contractor's legal obligation regarding a written contract for this project?
A. The contractor may proceed without a written contract because the project
value is under the $10,000 threshold
B. The contractor must provide a written contract containing required disclosures
, because the project exceeds $1,000 in value
C. The contractor only needs a verbal agreement witnessed by two adults to
comply with Arizona law
D. The contractor is exempt from written contract requirements because
residential fencing is considered a specialty trade
Correct Answer: B
Explained Point Form Notes:
Arizona A.R.S. §32-1153 requires a written contract for residential
construction projects exceeding $1,000 in value; this is not optional,
regardless of the relationship between contractor and homeowner 8
The written contract must contain specific disclosure items including the
contractor's license number, scope of work, total price, payment schedule,
and lien warnings
Distractor A is incorrect because the $10,000 threshold does not exist for
written contract requirements in Arizona; the threshold is $1,000