● As distance from the potential explosion site decreases, the potential
for damage to an exposed site from an explosion.... Answer: increases.
● Your installation is increasing the NEW for a storage site built in 1969
and storing a hazard division that was not previously approved for that
location. Do you need to complete an ESSP? Answer: Yes, and it
requires DDESB approval.
● Intraline distance (ILD) is the minimum distance permitted between...
Answer: two operating buildings.
● The purpose of an ESSP is to ensure safety, provide specifications,
and... Answer: establish limits.
● You must submit an ESSP for DDESB approval if the installation is...
Answer: building an ES within an existing ESQD arc.
● Failing to submit a successful ESSP may result in... Answer: reduced
operational capacity.
FAMILIARIZATION PREMIUM
CORRECT ANSWERS
● As distance from the potential explosion site decreases, the potential
for damage to an exposed site from an explosion.... Answer: increases.
● Your installation is increasing the NEW for a storage site built in 1969
and storing a hazard division that was not previously approved for that
location. Do you need to complete an ESSP? Answer: Yes, and it
requires DDESB approval.
● Intraline distance (ILD) is the minimum distance permitted between...
Answer: two operating buildings.
● The purpose of an ESSP is to ensure safety, provide specifications,
and... Answer: establish limits.
● You must submit an ESSP for DDESB approval if the installation is...
Answer: building an ES within an existing ESQD arc.
● Failing to submit a successful ESSP may result in... Answer: reduced
operational capacity.