Atssa Traffic Control Supervisor "The Typical Project" Module 7 Questions With Correct Solutions

Document preview thumbnail
Preview 2 out of 6 pages

ATSSA TRAFFIC CONTROL SUPERVISOR "THE TYPICAL PROJECT" MODULE 7 Questions with Correct Solutions Question: 1. Planning Answer: What stage: Gather available data Prior to occupying TTC zone Consider the needs of all users Coordinate between adjacent or overlapping projects Question: 2. Design Answer: What stage: Select best traffic control alternative based on: safety, mobility, cost, constructability Question: 3. Traffic Factors, characteristics, and speed. Traffic controls, urban features, and traffic generators Answer: What Factors effect the design of a TTC plan Question: 4. What are the MUTCD categories of Work Duration? Answer: Long-term stationary Intermediate-term stationary short-term stationary short-duration mobile Question: 5. Occupies location more than 3 days larger channelizing devices and post mounted signs conflicting roadway markings removed and replaced with temporary markings cover or remove conflicting signage Answer: Long-term stationary (MUTCD work duration category) Question: 6. More than 1 day, less than 3 days Nightime work of more than 1 hour Answer: Intermediate-stationary (MUTCD work duration category)

Content preview

ATSSA TRAFFIC CONTROL SUPERVISOR "THE TYPICAL
PROJECT" MODULE 7 Questions with Correct Solutions


Question:
1. Planning

Answer:
What stage: Gather available data Prior to occupying TTC zone Consider the needs of all
users Coordinate between adjacent or overlapping projects


Question:
2. Design

Answer:
What stage: Select best traffic control alternative based on: safety, mobility, cost,
constructability


Question:
3. Traffic Factors, characteristics, and speed. Traffic controls, urban features, and traffic
generators

Answer:
What Factors effect the design of a TTC plan


Question:
4. What are the MUTCD categories of Work Duration?

Answer:
Long-term stationary Intermediate-term stationary short-term stationary short-duration
mobile


Question:
5. Occupies location more than 3 days larger channelizing devices and post mounted signs
conflicting roadway markings removed and replaced with temporary markings cover or
remove conflicting signage

Answer:
Long-term stationary (MUTCD work duration category)


Question:
6. More than 1 day, less than 3 days Nightime work of more than 1 hour

Answer:
Intermediate-stationary (MUTCD work duration category)

, Question:
7. Daytime work 1 to 12 hours cones and portable signs

Answer:
Short-term stationary (MUTCD work duration category)


Question:
8. work that moves intermittently or continuously May use truck-mounted impact attenuators

Answer:
Mobile (MUTCD work duration category)


Question:
9. Constructability

Answer:
Nature of the work access requirements drainage issues, drainage during construction
construction equipment size of work space Access to work area room to maneuver equipment


Question:
10. Outside the shoulder On the shoulder with no encroachment on the shoulder with minor
encroachment within the median within the traveled way

Answer:
MUTCD "Locations of work"


Question:
11. Phasing

Answer:
Refers to TTC projects being broken into multiple steps Could be dangerous due to devices
and workers on the move coordination and timing are key


Question:
12. Public relations

Answer:
Working with the media News announcements Phone hotline door hangers / notices PCMS
one of the TMP (Transportation Management Plan) requirements


Question:
13. Notify Those affected Pre-con meeting Inspection before delivery of devices

Answer:
Pre-construction activities

Document information

Uploaded on
October 14, 2026
Number of pages
6
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$8.39

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
VictorGrades
5.0
(1)
Sold
24
Followers
0
Items
1887
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions