• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 110 pages
Exam (elaborations)

ICC Exam (California UST Inspector) Questions and Already Solved Solutions Updated.

Document preview thumbnail
Preview 4 out of 110 pages

Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: a.) The Regional Water Quality Board b.) The State Water Resources Control Board c.) The Department of Toxic Substance Control d.) The local agency - Answer a.) The Regional Water Quality Board CCR Title 23, Sec 2681(a) The regulations to enforce compliance of underground storage tank systems in the state are found in? a.) Code of Federal Regulations, 40 CFR Part 281 b.) California Code of Regulations, Title 23, Chapter 16 c.) Code of Federal Regulations, 40 CFR Part 280 d.) California Code of Regulations, Title 23, Chapter 17 - Answer b.) California Code of Regulations; Title 23, Chapter 16 By definition an "underground storage tank system" includes a.) The tank, all connected piping and dispensers b.) The tank, all connected piping, ancillary equipment and containment system c.) Only the tank d.) Only tanks totally beneath the surface of the ground - Answer b.) The tank, all connected piping, ancillary equipment and containment system (H&SC, Sec 25281(z)) The written report submitted to the local agency after an unauthorized release is required to include the following except: a.) Description of actions taken to stop the release b.) Cause of the release c.) Method of disposal of released product d.) Date on which the release was discovered - Answer b.) Cause of the release CCR Title 23, Sec 2652(c)

Content preview

ICC Exam (California UST Inspector)
Questions and Already Solved Solutions
2026-2027 Updated.
Which agency approves a site-specific variance which allows for an alternative method of
construction or monitoring:

a.) The Regional Water Quality Board

b.) The State Water Resources Control Board

c.) The Department of Toxic Substance Control

d.) The local agency - Answer a.) The Regional Water Quality Board

CCR Title 23, Sec 2681(a)



The regulations to enforce compliance of underground storage tank systems in the state are
found in?

a.) Code of Federal Regulations, 40 CFR Part 281

b.) California Code of Regulations, Title 23, Chapter 16

c.) Code of Federal Regulations, 40 CFR Part 280

d.) California Code of Regulations, Title 23, Chapter 17 - Answer b.) California Code of
Regulations; Title 23, Chapter 16



By definition an "underground storage tank system" includes

a.) The tank, all connected piping and dispensers

b.) The tank, all connected piping, ancillary equipment and containment system

c.) Only the tank

d.) Only tanks totally beneath the surface of the ground - Answer b.) The tank, all connected
piping, ancillary equipment and containment system



(H&SC, Sec 25281(z))



The written report submitted to the local agency after an unauthorized release is required to
include the following except:

a.) Description of actions taken to stop the release

b.) Cause of the release

c.) Method of disposal of released product

d.) Date on which the release was discovered - Answer b.) Cause of the release

CCR Title 23, Sec 2652(c)

,An unauthorized release which does not escape from secondary containment only requires a
record on the operator's monitoring reports provided:

A. It did not increase the hazard of fire

B. It did not cause any deterioration of the secondary containment

C. It was cleaned up within 8 hours of detection

D. All of the above - Answer D. All of the above

H&SC, Sec 25294



The annual monitoring certification may be performed by:

A. A person possessing the appropriate contractors licenses

B. An individual trained and certified by the manufacturer of the monitoring equipment

C. A designated UST operator

D. A person who meets the requirements of both a and b - Answer D. A person who meets the
requirements of both a and b

CCR Title 23, Sec 2715(i)



When an automatic tank gauge is utilized for single-walled tank leak detection, it shall generate
a post-test hard copy data report of the following information, except:

a.) Liquid volume

b.) Fuel depth

c.) Outside air temperature

d.) Time and date of test - Answer c.) Outside air temperature

CCR Title 23, Sec 2643(b)(1)



If a UST system is utilizing an overfill alarm, the alarm must be triggered to alert the transfer
operator when the tank is no more than ___________ full

a.) 85%

b.) 95%

c.) 90%

d.) 80% - Answer c.) 90%



An automatic tank gauge is utilized for leak detection of the ______________.

a.) Tank

b.) Tank and Piping

c.) Piping

,d.) Interstitial space - Answer a.) Tank

CCR Title 23, Sec 2643(b)(1)



After completion of enhanced leak detection (ELD) test, the ELD test results must be submitted
to the _________________.

a.) The local agency

b.) The SWRCB

c.) Owner of the UST system

d.) To both the SWRCB and the local agency - Answer d.) To both the SWRCB and the local
agency

CCR Title 23, Sec 2644.1(a)(5)



A permit to operate a UST system must have all of the following listed on the permit, EXCEPT:

a.) The state UST identification number(s)

b.) Name of the tank manufacturer and tank capacity

c.) Permit expiration date

d.) Monitoring requirements - Answer b.) Name of the tank manufacturer and tank capacity

CCR Title 23, Sec 2712(c)



A temporary closure is appropriate for which of the following:

a.) The UST system is empty and will be removed from service indefinitely

b.) The UST system has ceased to store hazardous materials but will be used within the next 12
consecutive months

c.) The UST system is unable to meet compliance requirements and will be removed

d.) The UST system has been red-tagged - Answer b.) The UST system has ceased to store
hazardous materials but will be used within the next 12 consecutive months

CCR Title 23, Sec 2671 & 2670



A local agency determines that a UST facility within the last year had compliance issues. Prior to
issuing a new permit or renewal to operate an UST the local agency shall:

a.) Ask the state to assist in a joint inspection

b.) Request the owner/operator to submit a "Return to Compliance" form.

c.) Refer to a District Attorney Investigator

d.) Inspect the facility and determine compliance - Answer d.) Inspect the facility and
determine compliance

CCR Title 23, Sec 2712(c)

, All the following components require third party certification, except:

a.) Automatic tank gauging systems

b.) Statistical inventory reconciliation methods

c.) Spill Containment lids

d.) Liquid phase out-of-tank products - Answer c.) Spill Containment lids



The exterior surface of an underground storage tank must bear a marking or label which shows
the following information, except:

a.) Design pressure in psig

b.) Useable capacity in gallons.

c.) Width of the interstitial space

d.) Identity of manufacturer - Answer c.) Width of the interstitial space

CCR Title 23, Sec 2631(b)



Which of the following is not a confined space:

a.) A really deep turbine sump

b.) A space not designed for continuous employee occupancy

c.) An area with limited access

d.) An area with limited ventilation - Answer d.) An area with limited ventilation

CCR Title 8, Sec 5157(b)



A secondary containment system which is not an integral part of primary containment shall be
designed and constructed according to an engineering specification approved by a third party.
The secondary containment system shall contain ______________ of the volume of the largest
primary container within it, in the case of multiple primary containers:

a.) 100 percent

b.) 10 percent

c.) 110 percent

d.) 150 percent - Answer d.) 150 percent

CCR Title 23, Sec 2631(e)(1)(B)



All the following are approved overfill prevention systems, except:

a.) Automatic shutoff devices

b.) Spill Containers

c.) Overfill alarms

d.) Flapper valves - Answer b.) Spill Containers

Document information

Uploaded on
October 13, 2026
Number of pages
110
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9
3.6
(182)
Sold
1033
Followers
131
Items
32467
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions