• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

API 653 RECERTIFICATION QUIZ Questions with Correct Solutions

Document preview thumbnail
Preview 2 out of 6 pages

API 653 RECERTIFICATION QUIZ Questions with Correct Solutions Question: 1. Per API 653 , with of the following is required when converting an existing tank to operation at elevated temperatures when it was not originally designed and constructed to API 650, Appendix M? Answer: The Shell to bottom joint shall be evaluated for fatigue Question: 2. When removing an existing tank bottom, all arc-gouged areas of the tank shell-to-bottom shall be: Answer: examined using magnetic particle inspection, and defective areas repaired and re-examined. Question: 3. If RBI assessment has been conducted and the tank has cathodic protection plus a thin-film lining, the maximum inspection interval is:

Content preview

API 653 RECERTIFICATION QUIZ Questions with Correct Solutions


Question:
1. Per API 653 , with of the following is required when converting an existing tank to
operation at elevated temperatures when it was not originally designed and constructed to
API 650, Appendix M?

Answer:
The Shell to bottom joint shall be evaluated for fatigue


Question:
2. When removing an existing tank bottom, all arc-gouged areas of the tank shell-to-bottom
shall be:

Answer:
examined using magnetic particle inspection, and defective areas repaired and re-examined.


Question:
3. If RBI assessment has been conducted and the tank has cathodic protection plus a thin-film
lining, the maximum inspection interval is:

Answer:
14 years


Question:
4. When installing a new nozzle in a tank of unknow material, what stress value should be
used to calculate the required shell thickness and reinforcement?

Answer:
20,000 lbf/in2


Question:
5. In regards to underside corrosion on tank bottoms, the corrosion rate of steel in a wet
environment.

Answer:
may double with every 18 °F increase in temperature above 77 °F.


Question:
6. Grade 350W/50W is acceptable for tank plate to a maximum thickness of:

Answer:
45mm (1.75in) if fully killed and made to a fine grain practice.

, Question:
7. If an RBI assessment has been conducted and the tank has a release prevention barrier,
the maximum initial inspection interval is:

Answer:
25 years


Question:
8. As an alternative to the procedures in API 653 for the evaluation of any thinning of the tank
shell below minimum required wall thickness may be evaluated for continued service using
which code?

Answer:
API RP 579, section 4, 5 or 6.


Question:
9. When welding on a tank shell constructed of Group I steel that is greater than 1.5 inches
thick below what minimum metal temperature ?preheat?

Answer:
200°F


Question:
10. When evaluated an existing temperature services tank, which has a successful service
history of operation but was not originally designed and constructed to the requirement of
API 650, appendix M, which condition temperature has to be used?

Answer:
The max Operating Temperature shall not exceed the temperature at which the tank has
successfully operated in the pass.


Question:
11. Flange material used for tank repair and alteration shall meet the minimum requirements
for the material specifications according to:

Answer:
The as built standard


Question:
12. which is an advantage of thick film UN-REIN- FORCED linings ?

Answer:
Fast curing and can be put back in service after 24 hours at normal ambient temperature.

Document information

Uploaded on
October 13, 2026
Number of pages
6
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$8.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
VictorGrades
5.0
(1)
Sold
25
Followers
0
Items
2765
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions