• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

IMSA Signal Technician Level 1 End Of Chapter Questions With Complete Solutions

Document preview thumbnail
Preview 2 out of 7 pages

What is the primary function of the IMSA? - ANSWER-Safety education IMSA stands for: - ANSWER-International Municipal Signal Association Which of the following is NOT an IMSA certification? - ANSWER-Y: Traffic Signal Level II Design/Engineer Technician Y: Traffic Signal Level II Field Technician Y: Traffic Signal Level II Bench Technician N: Traffic Signal Level III Bridge Design Technician Which of the following are potential safety hazards? - ANSWER-Overhead and underground power

Content preview

IMSA Signal Technician Level 1 End Of
Chapter Questions With Complete
Solutions
What is the primary function of the IMSA? - ANSWER-Safety education

IMSA stands for: - ANSWER-International Municipal Signal Association

Which of the following is NOT an IMSA certification? - ANSWER-Y: Traffic Signal Level
II Design/Engineer Technician
Y: Traffic Signal Level II Field Technician
Y: Traffic Signal Level II Bench Technician
N: Traffic Signal Level III Bridge Design Technician

Which of the following are potential safety hazards? - ANSWER-Overhead and
underground power
Gas
Aerial lift equipment

What are the sections of a ramp meter signal? - ANSWER-Circular red, circular green

PPE stands for: - ANSWER-Personal Protective Equipment

Which of the follow is an example of adequate fall protection during the operation of
aerial lift equipment? - ANSWER-Full body harness
Safety belt
Rails of a platform lift

Work Zone Supervisor is responsible for which of the following tasks? - ANSWER-
Ensure advance warning devices have not been removed or relocated

Which of the following traffic signal coordination method is typically least expensive? -
ANSWER-Time-based coordination

Which of the following is a definition of cycle length: - ANSWER-The elapsed time
between the start of a specific display until that display comes up again

Which of the following is a characteristic of sequential phases: - ANSWER-They cannot
occur at the same time

Which of the following is a definition for initial green time: - ANSWER-Minimum time that
the green indication must be displayed

, The only point in the cycle of a coordinated traffic signal controller where the major-
street phase is allowed to end is called: - ANSWER-Yield point

Which of the following is NOT a common mode of operation for timing plans in a signal
system: - ANSWER-Y: Time of day
N: Traffic related
Y: Traffic Responsive
Y: Traffic adaptive

Which of the following is NOT a sentence type in the MUTCD? - ANSWER-Y:
Standards; requirements that have to be followed
Y: Guidance; recommendations that are to be followed unless there is a good reason
not to
N: Objectives; reasons behind the standards and guidance
y: Support; additional information to clarify the standards and guidance

Which of the following is an example configuration of an Emergency-Vehicle Traffic
Control Signals: - ANSWER-Three-section traffic signal with circular red, circular yellow,
and smaller circular yellow indications

The following phases are typically assigned to the major street through movements: -
ANSWER-2 and 6

The green interval is made up which three components? - ANSWER-Minimum green,
passage time, maximum green

What are the three types of recall features of a traffic signal controller? - ANSWER-
Minimum, maximum, pedestrian (+soft)

In a coordination plan, what is the number of seconds given to each phase at the
intersection? - ANSWER-Split (g,y,r)

Two common terms to describe traffic signal supports and signal heads are: -
ANSWER-Rigid and free-swinging

In a single wire with a single point attachment configuration, the wire that supports the
signal head is called the: - ANSWER-Messenger wire

The two nominal diameter sizes for vehicular signal lenses are: - ANSWER-8 in (200
mm) and 12 in (300 mm)

Loop detectors operate on the principle of: - ANSWER-Inductance

The piece of cable that connects the controller cabinet to the loops is called a: -
ANSWER-Lead-in cable

Document information

Uploaded on
October 13, 2026
Number of pages
7
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1
3.9
(460)
Sold
1706
Followers
1073
Items
18569
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions