What does this permit regulate? - correct answerDischarges of pollutants in storm water
associated with construction activity (storm water discharges) to waters of the united states
from construction site that disturb one or more acres of land surface, or that are part of a
common plan of development or sale that disturbs more than one acre of land surface.
The person in charge of the utility company, municipality, or other public or private company or
agency that owns or operates the __________ may also serve as the LRP. - correct answerLUP
Sediment basins, at a minimum, shall be designed according to the CASQA Construction BMP
Guidance Handbook. - correct answerTrue
In the RUSLE equation, "P" stands for - correct answerManagement operations and support
practices.
Management operations and support practices. - correct answerManagement operations and
support practices.
When does risk level one has to sample? - correct answerWhen required for non-visible
pollutants.
ATS instruments shall record which of the following? - correct answerFlow, turbidity, and pH
Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? - correct
answerK and LS
, Failure to obtain coverage under the permit for storm water discharges to waters of the US is a
violation of the - correct answerClean Water Act and California Water Code
For traditional construction projects the LRP may be - correct answerThe person who possesses
real properly interest in the land upon which the construction activities will occur for the
regulated site
What does NTU measure? - correct answera measurement of optical properties of a liquid that
cause light rays to be scattered and absorbed rather than transmitted in straight lines through a
sample.
Inspection Records have to be kept until the project is complete or three years, whichever
comes first. - correct answerFalse
Which factor(s) of RUSLE must be changed to recalculate risk when the construction duration
has changed? - correct answerR
BMP stands for - correct answerBest Management Practice
Do type 1 LUPs typically have a high potential to impact storm quality? - correct answerNo
What does RUSLE stand for? - correct answerRevised Universal Soil Loss Equation
A discharger must notify the Regional Water Boards if there are planned changes in the
construction activity that - correct answerMay result in non-compliance
A qualifying storm event is - correct answerA rain even that produces 1/2 inch or more of
precipitation with a period of 48 hours or more between rain events.
Answers A+ Graded 2026/2027
What does this permit regulate? - correct answerDischarges of pollutants in storm water
associated with construction activity (storm water discharges) to waters of the united states
from construction site that disturb one or more acres of land surface, or that are part of a
common plan of development or sale that disturbs more than one acre of land surface.
The person in charge of the utility company, municipality, or other public or private company or
agency that owns or operates the __________ may also serve as the LRP. - correct answerLUP
Sediment basins, at a minimum, shall be designed according to the CASQA Construction BMP
Guidance Handbook. - correct answerTrue
In the RUSLE equation, "P" stands for - correct answerManagement operations and support
practices.
Management operations and support practices. - correct answerManagement operations and
support practices.
When does risk level one has to sample? - correct answerWhen required for non-visible
pollutants.
ATS instruments shall record which of the following? - correct answerFlow, turbidity, and pH
Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? - correct
answerK and LS
, Failure to obtain coverage under the permit for storm water discharges to waters of the US is a
violation of the - correct answerClean Water Act and California Water Code
For traditional construction projects the LRP may be - correct answerThe person who possesses
real properly interest in the land upon which the construction activities will occur for the
regulated site
What does NTU measure? - correct answera measurement of optical properties of a liquid that
cause light rays to be scattered and absorbed rather than transmitted in straight lines through a
sample.
Inspection Records have to be kept until the project is complete or three years, whichever
comes first. - correct answerFalse
Which factor(s) of RUSLE must be changed to recalculate risk when the construction duration
has changed? - correct answerR
BMP stands for - correct answerBest Management Practice
Do type 1 LUPs typically have a high potential to impact storm quality? - correct answerNo
What does RUSLE stand for? - correct answerRevised Universal Soil Loss Equation
A discharger must notify the Regional Water Boards if there are planned changes in the
construction activity that - correct answerMay result in non-compliance
A qualifying storm event is - correct answerA rain even that produces 1/2 inch or more of
precipitation with a period of 48 hours or more between rain events.