Xactimate | UPDATED Questions with 100% Verified Answers
Q1: DRY 1/2
A: "1/2'' drywall hung, taped floated, ready for paint, light texture"
Q2: DRY PATCH
A: Drywall patcy
Q3: DRY 1/2 +++
A: smooth wall
Q4: PLA G2
A: Plaster 2 coats
Q5: PNT SP
A: Seal & paint - one coat each
Q6: PNT P
A: paint one coat
Q7: PNT S
A: seal - one coat
Q8: PNT SP2
A: seal 1, paint 2
Q9: PNT S2
A: Seal two coats
, Q10: PLA WLATH
A: Includes labor to remove plaster and wood lath, to prepare framing surfaces for installation of new lining and discard
all debris into a job site waste receptacle. Remove wood lath not included in demo formula
Q11: DRY LF
A: Drywall replacement per LF - up to 2" tall used for water claims
Q12: DRY ARCADD
A: Additional charge for hanging and finishing drywall in an arched wall opening or arched window
Q13: DRY RND
A: Vinyl or metal corner bead and installation labor. This item is the difference in cost between regular corner bead and
are bullnose corner bead. Add labor is also added because bullnose corners are more labor intensive
Q14: DRY ADD
A: Additional labor for installing drywall on ceilings or walls that are 11' to 14' high. Add for the square footage that is
11-14' high, not the total SF of the room.
Q15: PNT UL
A: Sealer and labor
Q16: PNT WGRID
A: Latex paint, sandpaper and labor. LF of wood window grid.
Q17: ACT AV
A: Acoustic ceiling tile
Q18: PNT ACT
A: Paint acoustic ceiling tile
Q19: WPR AV
A: Average wallpaper
Q1: DRY 1/2
A: "1/2'' drywall hung, taped floated, ready for paint, light texture"
Q2: DRY PATCH
A: Drywall patcy
Q3: DRY 1/2 +++
A: smooth wall
Q4: PLA G2
A: Plaster 2 coats
Q5: PNT SP
A: Seal & paint - one coat each
Q6: PNT P
A: paint one coat
Q7: PNT S
A: seal - one coat
Q8: PNT SP2
A: seal 1, paint 2
Q9: PNT S2
A: Seal two coats
, Q10: PLA WLATH
A: Includes labor to remove plaster and wood lath, to prepare framing surfaces for installation of new lining and discard
all debris into a job site waste receptacle. Remove wood lath not included in demo formula
Q11: DRY LF
A: Drywall replacement per LF - up to 2" tall used for water claims
Q12: DRY ARCADD
A: Additional charge for hanging and finishing drywall in an arched wall opening or arched window
Q13: DRY RND
A: Vinyl or metal corner bead and installation labor. This item is the difference in cost between regular corner bead and
are bullnose corner bead. Add labor is also added because bullnose corners are more labor intensive
Q14: DRY ADD
A: Additional labor for installing drywall on ceilings or walls that are 11' to 14' high. Add for the square footage that is
11-14' high, not the total SF of the room.
Q15: PNT UL
A: Sealer and labor
Q16: PNT WGRID
A: Latex paint, sandpaper and labor. LF of wood window grid.
Q17: ACT AV
A: Acoustic ceiling tile
Q18: PNT ACT
A: Paint acoustic ceiling tile
Q19: WPR AV
A: Average wallpaper