• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

PJM Generation Cert | UPDATED Questions with 100% Verified Answers

Document preview thumbnail
Preview 3 out of 24 pages

PJM Generation Cert | UPDATED Questions with 100% Verified Answers

Content preview

PJM Generation Cert | UPDATED Questions with 100%
Verified Answers
Q1: Actions in low voltage alert?
A: Review transmission & generation outages
Request reactive reserve check


Q2: Heavy load voltage schedule warning purpose is to have
members prepare far max support of voltages on the?
A: Bulk Power System


Q3: Manual load dump warning & reduction of Non-critical plant
load issued when?
A: Primary reserve is less the the largest generating unit.
Loss of transmission facility jeopardize reliability after all possible measures have been
taken to increase reserves


Q4: Hot weather alert
A: COMED 90
DOM & EKPC 95


Q5: PJM issues high system voltage message
A: Gen operators should operate the lower end of their voltage bandwidth


Q6: Primary reserve warning
A: Ensure deffer able Maintenance is halted


Q7: General actions PJM takes when conservating ops initiated?
A: Purchase/load additional reserves
begin studying double contingencies
Lower IROL
Increase # of SOS calls


Q8: Purpose of heavy voltage schedule action is to increase
reactive reserves
A: EHV system


Q9: National terrorism advisory system 2 types of alerts?
A: Elevated threat
Imminent threat

,Q10: Non-critical plant load
A: lighting, office area a/c


Q11: Purpose of capacity emergency warning?
A: keep members informed of actual capacity shortages or contingencies that may
jeopardize reliability during RT ops
keep all affected system personnel aware of the forecast and actual status of the PJM
RTO


Q12: Heavy load voltage schedule action
A: Gen operators- maintain MVAR reserve on units connected to EHV


Q13: During cold weather action
A: Assume an unavailability rate for scheduled generation


Q14: During terrorism/sabotage emphasis on?
A: Operations & communications


Q15: For voltage support TOs can request?
A: Generators stay online


Q16: During Restoration what is removed from service until
sufficient load restored to maintain voltage
A: Shunt capacitors


Q17: Freq change=(load change/connected capacity)X Gov droop
in percentage
A:


Q18: LMP calculated day ahead market
A: Every hour
RT every 5mins


Q19: Penalty factor
A: incremental loss for a bus used to include the effect of losses on the dispatch


Q20: All call types
A: Operational, Emergency Messages, Informational


Q21: Voltage reduction Alert

, A: Est. operating reserve capacity is less than forecasted synchronized reserve equipment


Q22: Generation owners
A: Must handle environmental Alerts


Q23: Emergency requires action to?
A: Maintain freq prevent load loss, ensure safety and reliability


Q24: Alerts
A: Advance of operating day


Q25: Warning & actions
A: During that day


Q26: Emergency situation
A: Implement procedures within 30min


Q27: STE- Short term emergency rating
A:


Q28: Low voltage alerts
A: Analyze reactive capabilities
Reactive reserve check


Q29: Heavy load voltage schedule warning
A: 4 hrs prior


Q30: Heavy load voltage schedule action
A: 500kv (UHV system) support- EHV
Place caps online
Reactors removed
AVR online


Q31: High system voltage
A: caps out/reactors in


Q32: Manual load dump&reduction of non-critical load
A: issued when available primary reserve capacity less than largest Gen or Trans


Q33: For voltage support PJM can request generator adjustments

Document information

Uploaded on
October 7, 2026
Number of pages
24
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamsCollection
3.9
(45)
Sold
259
Followers
9
Items
40196
Last sold
19 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions