●● What is Plant 2000?
Answer: Unit
●● Plant 2001
Answer: SSA
●● MRP Area
Answer: Where material planning occurs
●● Storage Location (SLoc)
Answer: SSA/Unit receives and Issues materials
●● Warehouse
Answer: SSA material is picked or put away into storage bins
●● What are first levels for ERP?
Answer: Basis of inventory management (IM)
●● What are the last levels for ERP?
,Answer: Basis for warehouse management (WM)
●● STO Number
Answer: 71000
●● What does creation of STO trigger
Answer: Perform stock check in SSA
●● Outbound delivery number
Answer: 80000xxxx
●● When National
Answer: PO 45000
●● 3.Which A (Aging) indicator displays in the recoverable/ reparable
conversion by YOBUX TRANSATION IF THE RETURN (ZRL/ZRX)
PR is 36 days old
Answer: C. RED
●● 4.What screen title displays in the initial screen of the migo
transaction .
Answer: A. The screen title depends on the last movement type that was
posted.
,●● 5.what is the menu path used to enter time confirmation and
complete a work order.
Answer: A. Order>confirmation >overall completion confirmation
●● 6.what number is associated with the status that is used to deadline
the equipment.
Answer: A. 30
●● 7. When creating a dispatch (d1) notification , what cannot be done
before the notification is saved and the notification number is generated
Answer: C .the equipment dispatch 5987 form cannot be printed
●● What is the number of the inbound delivery that is associated with a
dedicated order from national
Answer: 180008205
●● What link should be clicked in the AIT application to perform a
customer pick up at the Ssa and to bring materials into the units
inventory
Answer: Pgr
●● What materials is available for this issue to work order
Answer: 015954742
, ●● From an existing p.m. notification which button is selected to create
the preventative maintenance pmo2 to work order
Answer: Button #2
●● In a maintenance notification where is the how recognize code
selected
Answer: In the coding field
●● Which button do you click to display the listing of the classes of
supply they can be requisition by the MRP area
Answer: Ext. Matl group
●● What button is used to trigger the install/Dismantle process for the
selected engine
Answer: Goods movement icon
●● What is the number of the return Zxs - pr that was created
Answer: 1000040425
●● What's up systems are currently install in the functional location
structure
Answer: A 50 caliber machine gun radio set
QUESTIONS AND ANSWERS
●● What is Plant 2000?
Answer: Unit
●● Plant 2001
Answer: SSA
●● MRP Area
Answer: Where material planning occurs
●● Storage Location (SLoc)
Answer: SSA/Unit receives and Issues materials
●● Warehouse
Answer: SSA material is picked or put away into storage bins
●● What are first levels for ERP?
Answer: Basis of inventory management (IM)
●● What are the last levels for ERP?
,Answer: Basis for warehouse management (WM)
●● STO Number
Answer: 71000
●● What does creation of STO trigger
Answer: Perform stock check in SSA
●● Outbound delivery number
Answer: 80000xxxx
●● When National
Answer: PO 45000
●● 3.Which A (Aging) indicator displays in the recoverable/ reparable
conversion by YOBUX TRANSATION IF THE RETURN (ZRL/ZRX)
PR is 36 days old
Answer: C. RED
●● 4.What screen title displays in the initial screen of the migo
transaction .
Answer: A. The screen title depends on the last movement type that was
posted.
,●● 5.what is the menu path used to enter time confirmation and
complete a work order.
Answer: A. Order>confirmation >overall completion confirmation
●● 6.what number is associated with the status that is used to deadline
the equipment.
Answer: A. 30
●● 7. When creating a dispatch (d1) notification , what cannot be done
before the notification is saved and the notification number is generated
Answer: C .the equipment dispatch 5987 form cannot be printed
●● What is the number of the inbound delivery that is associated with a
dedicated order from national
Answer: 180008205
●● What link should be clicked in the AIT application to perform a
customer pick up at the Ssa and to bring materials into the units
inventory
Answer: Pgr
●● What materials is available for this issue to work order
Answer: 015954742
, ●● From an existing p.m. notification which button is selected to create
the preventative maintenance pmo2 to work order
Answer: Button #2
●● In a maintenance notification where is the how recognize code
selected
Answer: In the coding field
●● Which button do you click to display the listing of the classes of
supply they can be requisition by the MRP area
Answer: Ext. Matl group
●● What button is used to trigger the install/Dismantle process for the
selected engine
Answer: Goods movement icon
●● What is the number of the return Zxs - pr that was created
Answer: 1000040425
●● What's up systems are currently install in the functional location
structure
Answer: A 50 caliber machine gun radio set