BICSI TECHNICIAN STUDY GUIDE UPDATED ACTUAL Exam
Questions and CORRECT Answers | Complete Exam Prep | A+
Verified
Question 1.
To avoid damaging cable jacket, how often must you securely fasten electrical
nonmetallic tubing (ENT)
Correct Answer: 3 Feet so it does not damage the cable
Question 2.
What is the minimum dedicated power requirement of a telecommunications enclosure
Correct Answer: 120 V ac/20
Question 3.
The clearance behind the PBB when mounted, should be no less than-
Correct Answer: 2inch clearance behind the PBB when mounted
Question 4.
When installing a plywood backboard, you should use galvanized screws that are a
minimum of ______ longer than the depth of the wall covering, including the plywood
Correct Answer: 0.5in
Question 5.
The use of under carpet telecommunications cable should be limited to:
Correct Answer: The interconnection point between horizontal cabling and
UTC is a transition point (TP)
Question 6.
Two 90-degree bends are allowed in any one conduit segment. A third bend may be
acceptable under certain situations
Correct Answer: Runs under 33 feet
Question 7.
When installing racks and cabinets on an access floor, what should they be secured to?
Correct Answer: The frame
• When placing cabinets on an access floor, how should the cabinets be
aligned? - ✓✓One edge flush with the floor tile cut line
, Question 8.
What is a telecommunications enclosure TE used for?
Correct Answer: May be used to provide a suitable option for moves, adds, and
changes without compromising infection control measures and other
restrictions
Question 9.
What size threaded rod would you typically use in a heavy duty ladder rack installation?
Correct Answer: 5/8in
Question 10.
A supplemental bonding network within an ER or data center consisting of a set of
conductors formed into a grid is often associated with what?
Correct Answer: Access flooring
Question 11.
Which type of anchor requires a hole to be drilled into the floor where the attachment is
to be made?
Correct Answer: Expansion anchors
Question 12.
Min seperation from electric motors and transformers?
Correct Answer: 48"
Question 13.
During which phase of the project would you determine cable labeling requirements?
Correct Answer: Pre-construction Phase
Question 14.
What type of documentation uses the original floor plans and reflects the actual installed
outlet locations, cables, length, and firestopping materials?
Correct Answer: Record drawings
Question 15.
Which project document is used to request clarification, supplemental information, or
approval of material substitutions?
Questions and CORRECT Answers | Complete Exam Prep | A+
Verified
Question 1.
To avoid damaging cable jacket, how often must you securely fasten electrical
nonmetallic tubing (ENT)
Correct Answer: 3 Feet so it does not damage the cable
Question 2.
What is the minimum dedicated power requirement of a telecommunications enclosure
Correct Answer: 120 V ac/20
Question 3.
The clearance behind the PBB when mounted, should be no less than-
Correct Answer: 2inch clearance behind the PBB when mounted
Question 4.
When installing a plywood backboard, you should use galvanized screws that are a
minimum of ______ longer than the depth of the wall covering, including the plywood
Correct Answer: 0.5in
Question 5.
The use of under carpet telecommunications cable should be limited to:
Correct Answer: The interconnection point between horizontal cabling and
UTC is a transition point (TP)
Question 6.
Two 90-degree bends are allowed in any one conduit segment. A third bend may be
acceptable under certain situations
Correct Answer: Runs under 33 feet
Question 7.
When installing racks and cabinets on an access floor, what should they be secured to?
Correct Answer: The frame
• When placing cabinets on an access floor, how should the cabinets be
aligned? - ✓✓One edge flush with the floor tile cut line
, Question 8.
What is a telecommunications enclosure TE used for?
Correct Answer: May be used to provide a suitable option for moves, adds, and
changes without compromising infection control measures and other
restrictions
Question 9.
What size threaded rod would you typically use in a heavy duty ladder rack installation?
Correct Answer: 5/8in
Question 10.
A supplemental bonding network within an ER or data center consisting of a set of
conductors formed into a grid is often associated with what?
Correct Answer: Access flooring
Question 11.
Which type of anchor requires a hole to be drilled into the floor where the attachment is
to be made?
Correct Answer: Expansion anchors
Question 12.
Min seperation from electric motors and transformers?
Correct Answer: 48"
Question 13.
During which phase of the project would you determine cable labeling requirements?
Correct Answer: Pre-construction Phase
Question 14.
What type of documentation uses the original floor plans and reflects the actual installed
outlet locations, cables, length, and firestopping materials?
Correct Answer: Record drawings
Question 15.
Which project document is used to request clarification, supplemental information, or
approval of material substitutions?