ASPHALT PAVING LEVEL 1 LATEST ACTUAL EXAM
WITH VERIFIED QUESTIONS & CORRECT ANSWERS
Question 1.
A full lot of super pave asphalt is what size? 1,000 tons 1,000 to 2000 tons 2000 to 4000 tons 1
days production
ANSWER
2000 to 4000 tons
Question 2.
Which is not typically used as an asphalt binder in fdot mix designs? PG 52-28 PG 58-22 PG
62-22 PG 76-22(PMA) PG 82-22 (PMA)
ANSWER
PG 62-22
Question 3.
Who cuts the density cores used for verification testing? The verification technician The
contractor The independent verification testing technician None of the above
ANSWER
The contractor
Question 4.
A full lot is composed of 5 sublots and 4 cores per lot T/F
ANSWER
False
Question 5.
What is the most important for consistent compaction of asphalt mix? The mix is hotter in
temperature The mix is colder in temperature The mix is uniform in temperature Temperature
of the mix does not affect compaction
ANSWER
The mix is uniform in temperature
Question 6.
Referring to general stationing guidelines, R1 would be ____ than R2 Closer to outside shoulder
Closure to the inside shoulder Both A and C
ANSWER
Both A and C
1
, Question 7.
While using the rolling straightedge, if the needle goes in the red zone indicating an
unacceptable high spot in the section, you then
ANSWER
Mark the pavement where the needle first goes into the red zone and place another mark where the
needle leaves the red zone and continue
Question 8.
For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on the
bridge deck. 1 inch Exactly 1/2 of the straightedge The entire straightedge None of the above
ANSWER
1 inch
Question 9.
For the first transverse joint on a project place the ___ on the new pavement while overlapping
the transverse joint by one inch. 4 foot level 15 foot manual straight edge Rolling straightedge
All the above
ANSWER
15 foot manual straight edge
Question 10.
When calibrating to check the low side of the rolling straight edge:
Place shims under the outer wheels Place the rolling straight edge on a surface that looks flat
gauge should read zero on both sides of the gauge Place shims under the center wheel
ANSWER
Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the
gauge
Question 11.
When calibrating to check the high side of the rolling straight edge:
Place shims under the outer wheels Place shims under the center wheel Place the rolling
straight edge on a surface that looks flat Place a 3/16 inch shin under the center wheel. The
gauge should read zero on both sides of the gauge.
ANSWER
Place a 3/16 inch shim under the center wheel. The gauge should read zero on both sides of the
gauge.
2
WITH VERIFIED QUESTIONS & CORRECT ANSWERS
Question 1.
A full lot of super pave asphalt is what size? 1,000 tons 1,000 to 2000 tons 2000 to 4000 tons 1
days production
ANSWER
2000 to 4000 tons
Question 2.
Which is not typically used as an asphalt binder in fdot mix designs? PG 52-28 PG 58-22 PG
62-22 PG 76-22(PMA) PG 82-22 (PMA)
ANSWER
PG 62-22
Question 3.
Who cuts the density cores used for verification testing? The verification technician The
contractor The independent verification testing technician None of the above
ANSWER
The contractor
Question 4.
A full lot is composed of 5 sublots and 4 cores per lot T/F
ANSWER
False
Question 5.
What is the most important for consistent compaction of asphalt mix? The mix is hotter in
temperature The mix is colder in temperature The mix is uniform in temperature Temperature
of the mix does not affect compaction
ANSWER
The mix is uniform in temperature
Question 6.
Referring to general stationing guidelines, R1 would be ____ than R2 Closer to outside shoulder
Closure to the inside shoulder Both A and C
ANSWER
Both A and C
1
, Question 7.
While using the rolling straightedge, if the needle goes in the red zone indicating an
unacceptable high spot in the section, you then
ANSWER
Mark the pavement where the needle first goes into the red zone and place another mark where the
needle leaves the red zone and continue
Question 8.
For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on the
bridge deck. 1 inch Exactly 1/2 of the straightedge The entire straightedge None of the above
ANSWER
1 inch
Question 9.
For the first transverse joint on a project place the ___ on the new pavement while overlapping
the transverse joint by one inch. 4 foot level 15 foot manual straight edge Rolling straightedge
All the above
ANSWER
15 foot manual straight edge
Question 10.
When calibrating to check the low side of the rolling straight edge:
Place shims under the outer wheels Place the rolling straight edge on a surface that looks flat
gauge should read zero on both sides of the gauge Place shims under the center wheel
ANSWER
Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the
gauge
Question 11.
When calibrating to check the high side of the rolling straight edge:
Place shims under the outer wheels Place shims under the center wheel Place the rolling
straight edge on a surface that looks flat Place a 3/16 inch shin under the center wheel. The
gauge should read zero on both sides of the gauge.
ANSWER
Place a 3/16 inch shim under the center wheel. The gauge should read zero on both sides of the
gauge.
2