• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Acls Final Updated Actual Exam Questions And Correct Answers

Document preview thumbnail
Preview 2 out of 15 pages

Acls Final Updated Actual Exam Questions And Correct Answers

Content preview

ACI GRADE 1 FIELD TESTING CERTIFICATION
PRACTICE TEST - IRVING EXPECTED QUESTIONS WITH
VERIFIED ANSWERS
Question 1.
For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh
concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F)

ANSWER
False (2-5 minutes)



Question 2.
The temperature measuring device must be accurate to within 0.1 degree. (T or F)

ANSWER



Question 3.
The temperature measuring device shall have a capacity of measuring temperature of freshly
mixed concrete throughout a range of _____ to _____ degree F ( ______ to ______ degree C)

ANSWER
30 to 120 degree F ( 0 to 50 degree C)



Question 4.
A composite sample is not needed if only the temperature test is being run. (T or F)

ANSWER
True



Question 5.
The temperature of fresh concrete in a placement must be measured by inserting a
thermometer into the top six inches of concrete. (T or F)

ANSWER
False (3 in.)



Question 6.
The temperature of the concrete is recorded to the nearest ______ degree F (______ degree C)

ANSWER
1 degree F (0.5 degree C)




1

, Question 7.
ASTM C1064 states the container used to measure temperature of concrete must be large
enough to provide at least 5 inches of concrete around the sensor. (T or F)

ANSWER



Question 8.
Calibrate the temperature measuring device at least __________, or whenever there is a question
of accuracy.

ANSWER
Annually



Question 9.
After the thermometer is placed in the concrete:

ANSWER
thermometer



Question 10.
According to ASTM C1064, what is one reason to take the temperature of concrete?

ANSWER
Verify conformance



Question 11.
It is allowable to remove the temperature measuring devices from the freshly mixed concrete to
read the temperature if you cannot see the reading. (T or F)

ANSWER
False



Question 12.
The maximum allowable time between obtaining the first and last portions of the composite
sample may not exceed 5 minutes. (T or F)

ANSWER
False




2

Document information

Uploaded on
October 5, 2026
Number of pages
15
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
4.0
(29)
Sold
300
Followers
4
Items
76015
Last sold
3 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions