◉ What environment problem is associated with CFC and HCFC use?
1 Answer: Ozone depletion
◉ Which of the following strategies does not qualify as providing
"preferred parking"? 1 Answer: Providing a randomly assigned
parking space
◉ How many years can an agricultural product grow or be raised to
be considered as rapidly renewable by LEED? 1 Answer: 10
◉ What is the first step in a successful waste management policy? 1
Answer: Reduce the total quantity of waste
◉ What is an appropriate use of the LEED logo? 1 Answer: For a link
to the website www.usgbc.org/leed
◉ Which specific refrigerant has the highest global warming
potential (GWP) of all the common refrigerants? 1 Answer: HFC-23
,◉ What sustainability concept can xeriscaping contribute to? 1
Answer: Water efficient irrigation
◉ Which LEED recognized strategy will require chain-of-custody
documentation as proof of credit compliance? 1 Answer: Certified
Wood
◉ The CRI Green Label Plus Certification program certifies what
type of building material? 1 Answer: Carpet
◉ Which type of system or equipment would not be a consumer of
process water? 1 Answer: Domestic hot water heater
◉ What is required as documentation for each and every
prerequisite and credit in the LEED for Building Design and
Construction Rating System? 1 Answer: A letter template
◉ How many of the 110 available points in most of the rating
systems are considered "bonus" points? 1 Answer: 10
◉ Solar reflectance is roughly synonymous with what term? 1
Answer: albedo
, ◉ What factor should a project team not consider when calculating
life cycle costs? 1 Answer: None of the Above
(Life Span, Initial Cost, Maintenance Costs, Operating Costs)
◉ Which of the following is not required of an Innovation and
Design strategy? 1 Answer: It must be cost effective
◉ A project generates 100 tons of waste throughout construction. 50
tons are collected off-site and sent to a sorting facility with a facility
wide diversion rate of 60%. 40 tons are separated on-site and sent
directly to recyclers. The final 10 tons are incinerated off-site. What
percentage of waste does LEED consider to have been recycled? 1
Answer: 70%
◉ A building material that is made from recycled soda bottles
contains ___________________? 1 Answer: Post-consumer recycled
content
◉ If a project has 1 full time (40 hour a week) employee and 6 part
time (20 hour a week) employees, what is the project's Full Time
Equivalent (FTE) value? 1 Answer: 4
◉ What is true of the CIR process? 1 Answer: CIRs cost $220 each
COMPLETE QUESTIONS AND
◉ What environment problem is associated with CFC and HCFC use?
1 Answer: Ozone depletion
◉ Which of the following strategies does not qualify as providing
"preferred parking"? 1 Answer: Providing a randomly assigned
parking space
◉ How many years can an agricultural product grow or be raised to
be considered as rapidly renewable by LEED? 1 Answer: 10
◉ What is the first step in a successful waste management policy? 1
Answer: Reduce the total quantity of waste
◉ What is an appropriate use of the LEED logo? 1 Answer: For a link
to the website www.usgbc.org/leed
◉ Which specific refrigerant has the highest global warming
potential (GWP) of all the common refrigerants? 1 Answer: HFC-23
,◉ What sustainability concept can xeriscaping contribute to? 1
Answer: Water efficient irrigation
◉ Which LEED recognized strategy will require chain-of-custody
documentation as proof of credit compliance? 1 Answer: Certified
Wood
◉ The CRI Green Label Plus Certification program certifies what
type of building material? 1 Answer: Carpet
◉ Which type of system or equipment would not be a consumer of
process water? 1 Answer: Domestic hot water heater
◉ What is required as documentation for each and every
prerequisite and credit in the LEED for Building Design and
Construction Rating System? 1 Answer: A letter template
◉ How many of the 110 available points in most of the rating
systems are considered "bonus" points? 1 Answer: 10
◉ Solar reflectance is roughly synonymous with what term? 1
Answer: albedo
, ◉ What factor should a project team not consider when calculating
life cycle costs? 1 Answer: None of the Above
(Life Span, Initial Cost, Maintenance Costs, Operating Costs)
◉ Which of the following is not required of an Innovation and
Design strategy? 1 Answer: It must be cost effective
◉ A project generates 100 tons of waste throughout construction. 50
tons are collected off-site and sent to a sorting facility with a facility
wide diversion rate of 60%. 40 tons are separated on-site and sent
directly to recyclers. The final 10 tons are incinerated off-site. What
percentage of waste does LEED consider to have been recycled? 1
Answer: 70%
◉ A building material that is made from recycled soda bottles
contains ___________________? 1 Answer: Post-consumer recycled
content
◉ If a project has 1 full time (40 hour a week) employee and 6 part
time (20 hour a week) employees, what is the project's Full Time
Equivalent (FTE) value? 1 Answer: 4
◉ What is true of the CIR process? 1 Answer: CIRs cost $220 each