2026
60 minutes - Answers According to Nerc Standards, an emergency interchange
transaction can be exempt from tagging if it is less than_________________
2 business days - Answers A BA or LSE that requests an EEA 3 must complete and
EEA 3 report and submit it to the RC within how many days
5% - Answers During restoration efforts load pick-ups should not
exceed_____________ percentage of synchronized generation capacity
load and generation - Answers What are the two components that a system operator
should be aware of for controlling frequency during a system restoration if they are in
an islanded situation
Energy Emergency Alerts - Answers What system was put in place to provide RC's
with a mechanism to handle energy deficiencies?
withing 60 minutes of the start of modification - Answers If due to a reliability event,
an interchange transaction must be modified, how long does the Sink Balancing
Authority have to modify the tag?
Frequency Fluctuations - Answers What is an example of a disturbance that has
caused you system to become islanded?
Continuous decline in frequency - Answers What is an instance is which you use
manual load shedding?
Schedule emergency assistance, recall all non-firm exports, start all available
generation - Answers What actions should be implemented during a EEA 2
Transmission facility is overloaded, voltages are rapidly decaying, and no other
situations are available - Answers What would be an appropriate situation for a
system operator to shed load?
Without delay, within 30 minutes - Answers If an RC issues you a directive to
implement when should it be implemented?
Simulated emergencies - Answers Each Operating Authority should periodically
practice________________
Its RC and any other potentially affected Transmission Operators - Answers If a
Transmission Operator has an anticipated emergency condition, it shall
inform_________________
, Annually - Answers How often shall the Transmission Operator and BA review and
update each emergency plan___________
60 - Answers According to Nerc Standards, emergency plans must include interim
provisions if it is expected to take more than how many minutes to implement the
contingency plan for loss of primary control facility
EEA 2 - Answers Which EEA is used to announce the change in transmission service
priority?
Reliability Coordinator - Answers Who is the only entity that can declare an EEA?
No one - Answers Who must a system operator receive approval from to manually
shed load?
frequency, the rate of frequency decay, the rate of voltage decay - Answers
Automatic load shedding schemes should consider the following 3 things........
periodic testing - Answers Blackstart capabilities should be verified
by______________
degrees - Answers Synchroscopes should be calibrated in_____________
Differential relay - Answers What type of relay is relay 87?
-50 - Answers If Ace is -50 before a disturbance it must return to____________
15 - Answers The disturbance recovery period is__________ minutes after the start
of of a reportable disturbance.
Constant Frequency, Constant Interchange, Tie-line Bias - Answers What are the 3
types of AGC? and what is AGC?
Distance relay - Answers What type of relay is relay 21?
Tie-line frequency bias - Answers Each BA shall operate its AGC on?
Ground relay - Answers What type of relay is relay 64
0 - Answers If ACE is 50 before a disturbance it must return to______________
interchange - Answers An_____________is a contract between a PSE and another
party to purchase or sell energy
INT-009 - Answers the purpose of this to ensure that BA implement the interchange
as agreed upon in the interchange confirmation process
protective, auxiliary, monitoring, programming, regulating - Answers What are the
types of relays?
overcurrent, ground, differential, distance - Answers What are examples of protective
relays?