• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Systems Analysis and Design Chapter 2 Test Bank

Document preview thumbnail
Preview 2 out of 5 pages

Prepare for exams with verified questions on the SDLC phases, project roles, feasibility analysis, and the systems analyst role for Chapter 2.

Content preview

Systems Analysis and Design -
Chapter 2 latest updates!!! 2026-
2027 | correct solutions with quiz &
answers | highly graded a+

Project Portfolio Management - CORRECT ANSWERS-a process of selecting,
prioritizing, and monitoring project results.
- determining of a project's contribution to an entire portfolio of a project reinforces the
need for a feasibility study
- an approval commitee must be selective about where to allocate resources as most
organizations have limited funds
-

What is PMP? - CORRECT ANSWERS-Project Management Professional available
through the Project Management Institute www.pmi.org

Project Methodology - CORRECT ANSWERS-is a formalized approach to implementing
the SDLC (basically a list of steps and deliverables)

Waterfall Development - CORRECT ANSWERS-phase to phase. The key deliverables
are usually voluminous and are presented to the approval commitee and project
sponsor for approval as the project moves from phase to phase.
** this one takes a really long time from beginning to end.

Parallel Development - CORRECT ANSWERS-the project is divided into a series of
subprojects that can be designed and implemented in parallel. Once all subprojects are
complete, there si a final intergration of the separate pieces.
**problem: is subprojects are to idependent there might be problems intergrating it all in
one at the end.

V Model - CORRECT ANSWERS-like the waterfall but this however, pays more
attention to testing.
** requires continuous testing

RAD - CORRECT ANSWERS-Rapid Application Development:
is a collection of methodologies that emerged in reponse to the weakness of waterfall
development

, Scope Creep - CORRECT ANSWERS-the most common reason for schedule and cost
of overruns occurs after the project is underway.
** The project manager shoul allow only absolutely necessary requirements to be added
after the project begins

Iterative Development - CORRECT ANSWERS-breaks the project down into a series of
versions that are developed sequentially.

System protoyping - CORRECT ANSWERS-Performs the analysis , design, and
implementation concurrently in order to quickly develop a simplified version of teh
proposed system and give it to the users for evaluation and feedback and then go back
and provide a second
** this is basically used to proof to the customer that the system is feasible

Throwaway Prototyping - CORRECT ANSWERS-design prototype is not entended to be
a working system.

Agile Development - CORRECT ANSWERS-is a group of programming-centric
methodologies that focus on streamlining the SDLC. Here face to face communication is
used.
- This was created in part because of the dissatisfaction with the sequential
mehtodologies
** There are several popular approches to this:
- Extremem prpogramming
- dynamic systems development method (DSDM)
- and SCRUM

Extreme Programming - CORRECT ANSWERS-small teams of programmers
communicate with programmers this methodlogy requires on-site user input which may
be difficult to obtain

What methodology is best to use when the user requirements are unclear? - CORRECT
ANSWERS-System and throwaway prototyping

What methodology is useful when reliability is very important? - CORRECT ANSWERS-
V- Model

What is a workplan? - CORRECT ANSWERS-Keeps track of tasks in the SDLC and the
amount of time it took

What is the PM's primary tool for managing the project? - CORRECT ANSWERS-The
project workplan: it is a table that lists all of the tasks in the work breakdown structure
(day, task ID, name, etc)

Reporting Structure - CORRECT ANSWERS-Project Manager
|

Document information

Uploaded on
October 1, 2026
Number of pages
5
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
kenmuthie
1.0
(1)
Sold
3
Followers
0
Items
457
Last sold
4 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions