SD __________________ of each activity's time is estimated as one-sixth of the difference
between the pessimistic and optimistic time estimates. SD = (tp - t0)/6
Give this one a try later!
standard deviation
Relationships between activities with respect to ______________ are called precedence
relationships.
Give this one a try later!
time dimension
,How do you measure the progress of the project?
Give this one a try later!
determine the percentage of resources used, the milestones achieved and
the activities completed by scheduled dates
Pessimistic time is the time required under the _______________
Give this one a try later!
worst conditions
______________ describes how far along project work is supposed to be at any given point
in the project schedule. It is budget of planned work.
Give this one a try later!
Planned value (PV)
_______________ indicates how efficiently the project team is using its time. It is the ratio of
earned value to planned value. SPI>1 normally good (ahead of schedule). SPI = 0.75
indicates 75% efficiency, and 25% wasted time.
Give this one a try later!
, schedule performance indicator (SPI)
Initial WBS includes:
1. Major activities at the _____________
2. Major activities can be developed ___________________-
Give this one a try later!
highest level of the hierarchy, around project phases or functions
Networks illustrate all activities in a project. Three advantages are that it allows
______________ of task. They show the _____________ among activities/task. And finally, networks
facilitates the calculation of the critical path.
Give this one a try later!
visualization, relationships
Optimistic time is the length of time required under _______________ .
Give this one a try later!
optimal conditions
______________ is a sequence of connected activities in a network.
between the pessimistic and optimistic time estimates. SD = (tp - t0)/6
Give this one a try later!
standard deviation
Relationships between activities with respect to ______________ are called precedence
relationships.
Give this one a try later!
time dimension
,How do you measure the progress of the project?
Give this one a try later!
determine the percentage of resources used, the milestones achieved and
the activities completed by scheduled dates
Pessimistic time is the time required under the _______________
Give this one a try later!
worst conditions
______________ describes how far along project work is supposed to be at any given point
in the project schedule. It is budget of planned work.
Give this one a try later!
Planned value (PV)
_______________ indicates how efficiently the project team is using its time. It is the ratio of
earned value to planned value. SPI>1 normally good (ahead of schedule). SPI = 0.75
indicates 75% efficiency, and 25% wasted time.
Give this one a try later!
, schedule performance indicator (SPI)
Initial WBS includes:
1. Major activities at the _____________
2. Major activities can be developed ___________________-
Give this one a try later!
highest level of the hierarchy, around project phases or functions
Networks illustrate all activities in a project. Three advantages are that it allows
______________ of task. They show the _____________ among activities/task. And finally, networks
facilitates the calculation of the critical path.
Give this one a try later!
visualization, relationships
Optimistic time is the length of time required under _______________ .
Give this one a try later!
optimal conditions
______________ is a sequence of connected activities in a network.