• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 76 pages
Exam (elaborations)

C-27 Landscaping Contractor License Exam – Complete Practice Test Bank.

Document preview thumbnail
Preview 4 out of 76 pages

C-27 Landscaping Contractor License Exam – Complete Practice Test Bank.

Content preview

C-27 Landscaping Contractor License
Exam – Complete Practice Test Bank


EXAM OVERVIEW


| Component | Details |
||-|
| License Code | C-27 |
| State | California |
| Governing Body | California Contractors State
License Board (CSLB) |
| Exams Required | C-27 Trade Exam + Law and
Business Exam |
| Format | Multiple Choice (4 choices per question) |
| Passing Score | CSLB uses standard contractor
exam scoring |
| Experience Required | 4 years at journey-level
within the classification within the past 10 years |

1

,| Application Fee | $450 (as of July 2026) |
| Initial License Fee | $200 (sole owner) or $350
(non-sole owner) |
| License Renewal | Every 2 years (active); every 4
years (inactive) |
| Contractor Bond | $25,000 |




EXAM CONTENT DOMAINS (C-27 Trade Exam)


The C-27 Landscaping Trade Examination is divided
into six major sections :


| Domain | Approximate Weight | Key Topics |
|||-|




2

,| Planning and Estimating | 23-26% | Project
planning, hardscape/drainage/irrigation design,
project estimating, botanical names |
| Construction Preparation | 13-14% | Site planning,
erosion control, trenching and grading |
| Hardscape Installation | 16% | Flatwork, masonry,
posts/fences/retaining walls, water features |
| Drainage, Irrigation, Lighting, and Plant
Installation | 23-24% | Drainage systems, bioswales,
irrigation valves/controllers, lighting,
plant/tree/mulch installation |
| Maintenance and Repair | 9-10% | Pruning, tree
removal, troubleshooting irrigation, repairing
hardscapes |
| Safety | 10-17% | Employee/job site safety, tree
work safety, Cal/OSHA compliance |


The Law and Business Exam covers Business
Organization, Business Finances, Employment
Requirements, Insurance and Liens, Contract
Requirements, Public Works, and Safety.

3

, PRACTICE QUESTIONS: PLANNING AND
ESTIMATING




QUESTION 1: A specification requires 3 cubic
yards of compost per 1,000 square feet. A planting
bed contains 4,500 square feet. How much compost
is required?


A. 12.5 cubic yards
B. 13.0 cubic yards
C. 13.5 cubic yards
D. 14.0 cubic yards



4

Document information

Uploaded on
October 1, 2026
Number of pages
76
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$29.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
supergrader
4.3
(3)
Sold
13
Followers
0
Items
3320
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions