Performance Zoning
Give this one a try later!
An approach to land use planning that is based on quantifiable
performance standards that regulate the intensity of land use to prevent
adverse impact on abutting and nearby properties.
Uses performance-based or goal-oriented criteria to establish review
parameters for proposed development projects.
Once an Architect has acquired their license in their jurisdiction, the Architect must?
Give this one a try later!
, The Architect must demonstrate continuing education per their jurisdiction.
The Architect must renew their registration at set intervals. The Architect
can form a limited liability company if 2/3 of the partners are registered.
What types of Charattes are QM actions in Schematic Design?
Give this one a try later!
Kickoff Charattes, Sustainability Charettes, and Remedial Charettes.
According to AIA B101, who owns Construction Documents
Give this one a try later!
The Architect owns Construction Documents
Cost Plus
Give this one a try later!
A contract where payment is for material and labor, with a profit factor
added.
Q. In one of the 50 states, a hospital under construction is damaged by an "Act of
God.” The state has also a "Good Samaritan Law.” Which of the following best explains
the importance of this law in this situation?
,Give this one a try later!
A. The owner will be fully refunded due to the owner’s insurance carried by
the state.
B. The architects helping with reconstruction will automatically have liability
coverage.
C. The construction team will be compensated by an emergency fund paid
by the state.
D. The contractor will be automatically covered by contractor's insurance
carried by the state.
Solution: The correct answer is B.
The so-called "Acts of God" are covered in the A201 section 8.3 Delays and
Extensions of Time. << If the Contractor is delayed at any time in the
commencement or progress of the Work by (...) fire, unusual delay in
deliveries, unavoidable casualties or other causes beyond the Contractor's
control, (...) then the Contract Time shall be extended by Change Order >>.
Good Samaritan legislation affords critical liability protection to architects
providing disaster assistance. A number of states have adopted Good
Samaritan laws intended to provide at least some protection to licensed
architects against liability for voluntary services during a government-
declared disaster, whether manmade or natural.
Reference: AIA. "A201." Retrieved from
https://www.aia.org/resources/71641-good-samaritan-state-statute-
compendium
What is the dimensions of 1-Cubic Yard
Give this one a try later!
A cubic yard (symbol yd3) is an Imperial / U.S. customary
(non-SI non-metric) unit of volume, used in the United
States.
It is defined as the volume of a cube with sides of 1 yard (3
feet, 36 inches, 0.9144 meters) in length.
, A cubic yard is the volume of a cube with the length, width
and height of one yard (3 feet or 36 inches). One cubic yard
is equal to 27 cubic feet. To help you picture this, the
volume of two washing machines is just over a cubic yard.
What is the prupose of an evaluation in schematic design?
Give this one a try later!
An evaluation is conducted to select the highest-quality alternative,
consider previous design iterations, and identify future design explorations.
Q. The owner of a new supermarket decides to add a covered area to host a seasonal
market for local products based on the architect’s suggestion. Although it does not
represent a significant additional cost, a change order is still necessary. Who should
submit it? Select the best answer.
Give this one a try later!
A. The general contractor
B. The owner
C. The supermarket manager
D. The architect
Solution: The correct answer is D.
AIA Document G701 - 2017 is used for implementing changes in the work
agreed to by the owner, contractor, and architect. Execution of a
completed G701 indicates agreement upon all terms of the change,
including any changes in the contract sum (or guaranteed maximum price)
and contract time. The form allows for signatures of the owner, architect,
and contractor, and for a description of the change. According to AIA
contract A201-2007 : A Change Order is a written instrument prepared by
the Architect and signed by the Owner, Contractor, and Architect, stating
their agreement upon all of the following:
change in the Work;
the amount of the adjustment, if any, in the Contract Sum; and
Give this one a try later!
An approach to land use planning that is based on quantifiable
performance standards that regulate the intensity of land use to prevent
adverse impact on abutting and nearby properties.
Uses performance-based or goal-oriented criteria to establish review
parameters for proposed development projects.
Once an Architect has acquired their license in their jurisdiction, the Architect must?
Give this one a try later!
, The Architect must demonstrate continuing education per their jurisdiction.
The Architect must renew their registration at set intervals. The Architect
can form a limited liability company if 2/3 of the partners are registered.
What types of Charattes are QM actions in Schematic Design?
Give this one a try later!
Kickoff Charattes, Sustainability Charettes, and Remedial Charettes.
According to AIA B101, who owns Construction Documents
Give this one a try later!
The Architect owns Construction Documents
Cost Plus
Give this one a try later!
A contract where payment is for material and labor, with a profit factor
added.
Q. In one of the 50 states, a hospital under construction is damaged by an "Act of
God.” The state has also a "Good Samaritan Law.” Which of the following best explains
the importance of this law in this situation?
,Give this one a try later!
A. The owner will be fully refunded due to the owner’s insurance carried by
the state.
B. The architects helping with reconstruction will automatically have liability
coverage.
C. The construction team will be compensated by an emergency fund paid
by the state.
D. The contractor will be automatically covered by contractor's insurance
carried by the state.
Solution: The correct answer is B.
The so-called "Acts of God" are covered in the A201 section 8.3 Delays and
Extensions of Time. << If the Contractor is delayed at any time in the
commencement or progress of the Work by (...) fire, unusual delay in
deliveries, unavoidable casualties or other causes beyond the Contractor's
control, (...) then the Contract Time shall be extended by Change Order >>.
Good Samaritan legislation affords critical liability protection to architects
providing disaster assistance. A number of states have adopted Good
Samaritan laws intended to provide at least some protection to licensed
architects against liability for voluntary services during a government-
declared disaster, whether manmade or natural.
Reference: AIA. "A201." Retrieved from
https://www.aia.org/resources/71641-good-samaritan-state-statute-
compendium
What is the dimensions of 1-Cubic Yard
Give this one a try later!
A cubic yard (symbol yd3) is an Imperial / U.S. customary
(non-SI non-metric) unit of volume, used in the United
States.
It is defined as the volume of a cube with sides of 1 yard (3
feet, 36 inches, 0.9144 meters) in length.
, A cubic yard is the volume of a cube with the length, width
and height of one yard (3 feet or 36 inches). One cubic yard
is equal to 27 cubic feet. To help you picture this, the
volume of two washing machines is just over a cubic yard.
What is the prupose of an evaluation in schematic design?
Give this one a try later!
An evaluation is conducted to select the highest-quality alternative,
consider previous design iterations, and identify future design explorations.
Q. The owner of a new supermarket decides to add a covered area to host a seasonal
market for local products based on the architect’s suggestion. Although it does not
represent a significant additional cost, a change order is still necessary. Who should
submit it? Select the best answer.
Give this one a try later!
A. The general contractor
B. The owner
C. The supermarket manager
D. The architect
Solution: The correct answer is D.
AIA Document G701 - 2017 is used for implementing changes in the work
agreed to by the owner, contractor, and architect. Execution of a
completed G701 indicates agreement upon all terms of the change,
including any changes in the contract sum (or guaranteed maximum price)
and contract time. The form allows for signatures of the owner, architect,
and contractor, and for a description of the change. According to AIA
contract A201-2007 : A Change Order is a written instrument prepared by
the Architect and signed by the Owner, Contractor, and Architect, stating
their agreement upon all of the following:
change in the Work;
the amount of the adjustment, if any, in the Contract Sum; and