Which of the following balancing control modes is used by PJM under normal
operations?
Give this one a try later!
Tie-Line Bias
What is the time requirement that a generator that wishes to self-schedule itself must
provide to PJM?
Give this one a try later!
20 minutes
,Severe cold weather conditions require which of the following to be staffed, started,
and available for loading?
1. hydro units
2. CTs and diesels
3. nuclear units
4. wind generators
Give this one a try later!
CTs and diesels
PJM should be made aware of any fuel shortage that a generator may experience.
This information assists in analyzing the resources and reliably operating the system. A
heightened awareness is expected during:
Give this one a try later!
extreme hot or cold conditions
PJM performs a Reliability Assessment Commitment starting with the results of the DA
market.
What philosophy does PJM use when performing this RAC?
Give this one a try later!
, Minimize start ups and no loads
Daily capacity numbers that are reported to PJM dispatcher throughout the operating
day should be based on what generator limit?
Give this one a try later!
Eco Max
The PJM Peak Period Maintenance season occurs:
Give this one a try later!
Between the 24th & 36th Wednesdays of the year
What is the threshold for PJM assigning or de-assigning regulation to generators?
Give this one a try later!
+ / - 15 MW of the requirement
The two control signals sent by the PJM EMS are:
Give this one a try later!
, Regulation & Dispatch Rate/desired MW output
Which of the following PJM esystems are used to report unit outages?
1. eDART, eMKT, & eGADS
2. eMTR, eSchedules, & eMKT
3. eDART, eCapacity, & eGADS
4. eDART, eMKT, & eCapacity
Give this one a try later!
eDART, eMKT, & eGADS
Under normal operating conditions, what is the limit that will provide the lowest
output level of a generating unit?
Give this one a try later!
Eco Min
What info does PJM provide to members during a Min Gen Alert? (2)
Eco Min limits
Emergency Reducible info
Adjusted Min Gen
Valley & Load Estimate
operations?
Give this one a try later!
Tie-Line Bias
What is the time requirement that a generator that wishes to self-schedule itself must
provide to PJM?
Give this one a try later!
20 minutes
,Severe cold weather conditions require which of the following to be staffed, started,
and available for loading?
1. hydro units
2. CTs and diesels
3. nuclear units
4. wind generators
Give this one a try later!
CTs and diesels
PJM should be made aware of any fuel shortage that a generator may experience.
This information assists in analyzing the resources and reliably operating the system. A
heightened awareness is expected during:
Give this one a try later!
extreme hot or cold conditions
PJM performs a Reliability Assessment Commitment starting with the results of the DA
market.
What philosophy does PJM use when performing this RAC?
Give this one a try later!
, Minimize start ups and no loads
Daily capacity numbers that are reported to PJM dispatcher throughout the operating
day should be based on what generator limit?
Give this one a try later!
Eco Max
The PJM Peak Period Maintenance season occurs:
Give this one a try later!
Between the 24th & 36th Wednesdays of the year
What is the threshold for PJM assigning or de-assigning regulation to generators?
Give this one a try later!
+ / - 15 MW of the requirement
The two control signals sent by the PJM EMS are:
Give this one a try later!
, Regulation & Dispatch Rate/desired MW output
Which of the following PJM esystems are used to report unit outages?
1. eDART, eMKT, & eGADS
2. eMTR, eSchedules, & eMKT
3. eDART, eCapacity, & eGADS
4. eDART, eMKT, & eCapacity
Give this one a try later!
eDART, eMKT, & eGADS
Under normal operating conditions, what is the limit that will provide the lowest
output level of a generating unit?
Give this one a try later!
Eco Min
What info does PJM provide to members during a Min Gen Alert? (2)
Eco Min limits
Emergency Reducible info
Adjusted Min Gen
Valley & Load Estimate