This practice test covers weeks 1-4 course materials, which include an introduction to project quality
management, quality planning, quality plan implementation, and quality control. Each answer contains
detailed explanations to help you master the course materials. Take notes as you learn as the final exam
will cover week 1-week 6 course materials.
Test Parameters
Logistics: Online
Number of Questions: 10
Duration: 60 minutes
Possible points: 100 points
Questions Type: Fill in the blank, multiple choice, multiple answer, and matching
Question Delivery: One question at a time
Multiple Attempts: Unlimited
Force Completion: Once started, this Test must be completed in one sitting.
Due date: Sunday of the FOURTH week of the course
Take the Quiz Again
Attempt History
Attempt Time Score
KEPT Attempt 1 1 minute 100 out of 100
LATEST Attempt 3 2 minutes 90 out of 100
Attempt 2 3 minutes 90 out of 100 *
Attempt 1 1 minute 100 out of 100
* Some questions not yet graded
Submitted Dec 1 at 12:32am
https://northeastern.instructure.com/courses/196393/quizzes/642869 177
, 2024/12/1 00:32 Week 4 _Test Your Knowledge (TYK): PUM6135 71779 Project Quality Management SEC 14 Fall 2024 CPS [BOS-B-HY]
Question 1
10/ 10 pts
Success in project quality management requires the participation of all members of the project team. -----
----- responsibility is to provide suitable resources at adequate capacities.
Partnership
The supplier
Correct!
Management
The customer
Modern quality management approaches seek to minimize variation and to deliver results that meet
defined stakeholder requirements. Success requires the participation of all members of the project team.
Management retains, within its responsibility for quality, a related responsibility to provide suitable
resources at adequate capacities.
Question 2
10/ 10 pts
The upper specification limit (USL) of a process is set to 10 ounces, and underfilling (the lower
specification limit [LSL]) is not viewed as an important problem. Which of the following is true of this
process?
For the purpose of computing the capability index, one can assume that LSL = USL.
Correct!
For the purpose of computing the capability index, one can assume that LSL = 0.
Such a process is never capable because the capability index cannot be calculated.
Such a process is always capable, regardless of its mean and standard deviation.
If lower specification limit is not viewed as problem, then we can assume LSL = 0.
https://northeastern.instructure.com/courses/196393/quizzes/642869 2/7
Week 4_Test Your Knowledge (TYK)
Due No due date
Points 100
Questions 10
Time Limit None
Allowed Attempts Unlimited
Instructions
This practice test covers weeks 1-4 course materials, which include an introduction to project quality
management, quality planning, quality plan implementation, and quality control. Each answer contains
detailed explanations to help you master the course materials. Take notes as you learn as the final exam
will cover week 1-week 6 course materials.
Test Parameters
Logistics: Online
Number of Questions: 10
Duration: 60 minutes
Possible points: 100 points
Questions Type: Fill in the blank, multiple choice, multiple answer, and matching
Question Delivery: One question at a time
Multiple Attempts: Unlimited
Force Completion: Once started, this Test must be completed in one sitting.
Due date: Sunday of the FOURTH week of the course
Take the Quiz Again
Attempt History
Attempt Time Score
KEPT Attempt 1 1 minute 100 out of 100
LATEST Attempt 3 2 minutes 90 out of 100
Attempt 2 3 minutes 90 out of 100 *
Attempt 1 1 minute 100 out of 100
* Some questions not yet graded
Submitted Dec 1 at 12:32am
https://northeastern.instructure.com/courses/196393/quizzes/642869 177
, 2024/12/1 00:32 Week 4 _Test Your Knowledge (TYK): PUM6135 71779 Project Quality Management SEC 14 Fall 2024 CPS [BOS-B-HY]
Question 1
10/ 10 pts
Success in project quality management requires the participation of all members of the project team. -----
----- responsibility is to provide suitable resources at adequate capacities.
Partnership
The supplier
Correct!
Management
The customer
Modern quality management approaches seek to minimize variation and to deliver results that meet
defined stakeholder requirements. Success requires the participation of all members of the project team.
Management retains, within its responsibility for quality, a related responsibility to provide suitable
resources at adequate capacities.
Question 2
10/ 10 pts
The upper specification limit (USL) of a process is set to 10 ounces, and underfilling (the lower
specification limit [LSL]) is not viewed as an important problem. Which of the following is true of this
process?
For the purpose of computing the capability index, one can assume that LSL = USL.
Correct!
For the purpose of computing the capability index, one can assume that LSL = 0.
Such a process is never capable because the capability index cannot be calculated.
Such a process is always capable, regardless of its mean and standard deviation.
If lower specification limit is not viewed as problem, then we can assume LSL = 0.