◉ Program initiation requires technology to have been
demonstrated in a __________, which is considered equivalent to
___________.
Answer: -relevant environment
-Technology Readiness Level (TRL) 6.
◉ How does DoD categorize technology maturity?
Answer: Technology Readiness Levels (TRLs) are the way DoD has
chosen to categorize a program's
technology maturity.
◉ What are the three parameters of the Net-Ready KPP?
Answer: Attribute 1. Supports military operations:
Attribute 2. Is entered and managed on the network
Attribute 3. Effectively exchanges information
◉ What are the overarching requirement documents for
cybersecurity?
,Answer: DoDI 8510.01 Risk Management Framework (RMF)
DoDI 8500.01 Cybersecurity
DoDI 5000.02 Operations of the Defense Acquisition System
Clinger - Cohen Act (Cybersecurity Strategy) is a requirement
◉ Which KPP covers cybersecurity requirements?
Answer: System Survivability KPP
Seeks to
-Prevent or thwart attacks
-Mitigate or reduce vulnerabilities
-Recover to known good condition
◉ What are inherently governmental activities?
Answer: An activity that is so intimately related to the public interest
as to mandate performance by government personnel, such as
Program Managers, Integrated Product Team Leads, Contracting
◉ What is sufficient internal capability?
, Answer: Requires the agency to have an adequate number of
positions filled by Federal employees with appropriate training,
experience, and expertise
◉ When do you consider Corrosion Prevention Control (CPC) and
why?
Answer: Corrosion Prevention and Control (CPC) is important in the
early stages in a system development
-Greatest influence on total cost of ownership TOC
-Can balance tech opportunities with operational and sustainment
rqts
◉ When is the Corrosion Prevention and Control (CPC) drafted and
when is it required?
Answer: CPC will be drafted during the Materiel Solution Analysis
phase and is required prior to MS B
◉ What are some of the key activities in Corrosion Prevention and
Control (CPC) planning?
Answer: Key Activities in CPC Planning include:
-Establish Corrosion Prevention Team (CPT)
-Create documentation to implement CPC planning
-Include CPC considerations in source selection criteria
-Designing, manufacturing, testing, and supporting of the system
GUIDE WITH SOLUTIONS
◉ Program initiation requires technology to have been
demonstrated in a __________, which is considered equivalent to
___________.
Answer: -relevant environment
-Technology Readiness Level (TRL) 6.
◉ How does DoD categorize technology maturity?
Answer: Technology Readiness Levels (TRLs) are the way DoD has
chosen to categorize a program's
technology maturity.
◉ What are the three parameters of the Net-Ready KPP?
Answer: Attribute 1. Supports military operations:
Attribute 2. Is entered and managed on the network
Attribute 3. Effectively exchanges information
◉ What are the overarching requirement documents for
cybersecurity?
,Answer: DoDI 8510.01 Risk Management Framework (RMF)
DoDI 8500.01 Cybersecurity
DoDI 5000.02 Operations of the Defense Acquisition System
Clinger - Cohen Act (Cybersecurity Strategy) is a requirement
◉ Which KPP covers cybersecurity requirements?
Answer: System Survivability KPP
Seeks to
-Prevent or thwart attacks
-Mitigate or reduce vulnerabilities
-Recover to known good condition
◉ What are inherently governmental activities?
Answer: An activity that is so intimately related to the public interest
as to mandate performance by government personnel, such as
Program Managers, Integrated Product Team Leads, Contracting
◉ What is sufficient internal capability?
, Answer: Requires the agency to have an adequate number of
positions filled by Federal employees with appropriate training,
experience, and expertise
◉ When do you consider Corrosion Prevention Control (CPC) and
why?
Answer: Corrosion Prevention and Control (CPC) is important in the
early stages in a system development
-Greatest influence on total cost of ownership TOC
-Can balance tech opportunities with operational and sustainment
rqts
◉ When is the Corrosion Prevention and Control (CPC) drafted and
when is it required?
Answer: CPC will be drafted during the Materiel Solution Analysis
phase and is required prior to MS B
◉ What are some of the key activities in Corrosion Prevention and
Control (CPC) planning?
Answer: Key Activities in CPC Planning include:
-Establish Corrosion Prevention Team (CPT)
-Create documentation to implement CPC planning
-Include CPC considerations in source selection criteria
-Designing, manufacturing, testing, and supporting of the system