DBIA Exam Questions and Verified Answers Graded A+ 2026/27

Project Delivery System - How team members are organized, establishes when parties
engage, determines roles of parties, and determines sequence of design, procurement, and
construction (db, cmar, dbb)



Procurement Method - how team members are selected (QBS, best value, low price, sole
source)



contracting approach - how team members are paid (fp, gmp, cost reimbursement, target
price, unit price)



Design-Bid-Build (DBB) - linear, sequential process, A/E selected on qualifications, GC
selected on low price, design is fully completed without input from GC, A/E acting in owner's
interests, with a historically strong bond, process is well-established and understood



construction manager at risk - similar org structure to DBB, construction manager selected
by QBS or best value, contractor provides precon services, negotiated gmp contracting approach,
open book estimating process, potential to fast track project, construction cost determined before
design completed, potential issues over what is reasonably inferable from gmp design documents



Design-Build - The owner contracts with one entity (a person or firm) to provide both
design and construction services, designer and contractor have a direct contractual relationship,
selected by QBS or best value, wide spectrum of contracting approaches and organizational
structures, single point responsibility, owner does not manage designer, owner exposure to
claims is significantly reduced

,engineer procure construct (epc) - similar to design build, in industrial and power
generation sectors, systems and performance testing are central to scope, contractor will typically
perform engineering with its in-house staff, owner has need for single point responsibility,
contracts include plant and process performance guarantees, contract items include performance
and schedule liquidated damages and limitations of liability



Multiple Prime Contracting - owner contracts with multiple trade contractors, attributes
are typically similar to dbb, owner's ability to schedule and coordinate the work



Integrated Project Delivery (IPD) - multi-party agreement - all parties equal, QBS
procurement and target pricing contract approach, private sector use (limited at this time), key:
owner's ability to accept risk



public-private partnership (p3) - Instead of government building and maintaining major
infrastructure (such as highway, water treatment plant), build and maintenance is outsourced to a
private company. Opposed by public sector unions. this is not considered a delivery system but
its underlying approaches are delivery systems and typically use DB. multiple procurement and
contracting approaches



shift left - intense efforts to establish scope early in the process; drives early team
formation to include key trade subcontractors; can enable big decisions to be made early, affect
project outcomes at lowest cost, establish a need for co-location and collaboration, and compress
time during concurrent design and construction

, traditional design build - typically two-phase best value procurement with lump sum
contract; owner defines project requirements and scope of prescriptive work; use of
performance-based technical requirements with limited prescriptive specifications



progressive design build - design and price are progressively developed after the design-
builder is under contract; final project cost and schedule commitment is not established as part of
the selection process; two phases: preliminary services and final design and construction services



criteria documents - describe the end result




bridging documents - prescribes how to achieve the end result




design bid build paradigm - prior to bidding, owner undertakes a process to design the
project and all of its details to 100% complete plans and specs. the owner is therefore responsible
for success or failure of details of the design, and warrants the sufficiency of design to the
contractor. the owner is therefore liable to the contractor for any gaps between plans and
specifications and owner's requirements for project performance



design details responsibility - the owner should define its performance requirements and
award the contract on the basis of preliminary design; this makes the design-builder responsible
for completing the design in accordance with the owner's performance requirements. that also
causes the design-builder to warrant the sufficiency of the design to meet the owner's criteria and
the sufficiency of the design to subcontractors/suppliers that have no design responsibility

Document information

Uploaded on
September 30, 2026
Number of pages
17
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.98

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
22
Followers
0
Items
11309
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions