• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 49 pages
Exam (elaborations)

Florida Electrical Business Exam Study Guide 2026/2027 Accurate Questions With Correct Detailed Solutions || 100% Guaranteed Pass Newest Version

Document preview thumbnail
Preview 4 out of 49 pages

FLORIDA ELECTRICAL BUSINESS EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION 1. Failure to maintain OSHA logs could result in a base penalty of ? - ANSWER $1000 2. The minimum number of employees that will require a contractor to obtain workmen's compensation insurance is ? - ANSWER 1 employee 3. The type of bond that guarantees that the contractor is I'll perform the work in accordance with the contract is know as a ? bond - ANSWER Performance Bond 4. Short term project schedule is detailed explanation of the next two weeks of construction activities and should be developed and or reviewed by all the following except ? - ANSWER Architect 5. The ? usually prepares the project schedule - ANSWER Project manager 6. In order to provide adequate control the project schedule should be formally reviewed and updated - ANSWER At least once every 30 days 7. A contract will not be enforced if it is ? - ANSWER Illegal 8. According to the statute of frauds a contract need not be in writing and still be enforceable in Florida if it is ? - ANSWER Less than $500 in value and less than 1 year in length 9. The ? has the duty to record and post a Notice of Commencement to improve real property - ANSWER Owner 10. A subcontractor started work on his contract with the General Contractor on August 1 1999 The owner made the final payment to the general contractor on September 13 1999 The latest date the subcontractor can serve a notice to preserve his claim under the Conatitution Lein Law is what date and when ? - ANSWER September 13 1999 or day before payment 11. The type of contract we are in the contractor agrees to carry out stipulated job in exchange for a fix some of the money is a? Contract - ANSWER Lump sum 12. When a contractor has to perform extra work for a subcontractor he will recover the cost in the form of a? - ANSWER Back charge 13. The ? Should be jointly prepared with the material and equipment schedule - ANSWER Project schedule 14. Based on the completed contract method for a job bid at $300,000 and currently 66.67% complete with a gross profit of 16.67% ($50,000) the current amount of profit recognized would be ? - ANSWER $0 15. The right to repossess or replevy unused materials from a jobsite will not be effective if someone, in good faith, purchased it after removal from the site of the improvement. - ANSWER True. 16. The contractor must within _____ days after the receipt of the property owner's request, furnishish to property owner or the property owner's agent a list of the subcontractors and suppliers who have a contract with the contractor as of the date the request is received by the contractor. - ANSWER 10 days. 17. A property perfected lien may be discharged by an order of the circuit court of the _____ where the property is located. - ANSWER county 18. When any interested party files a complaint, the clerk will issue a summons to the lienor to show cause within _____ days why his or her lien should not to be enforced by action or vacated and canceled of record. - ANSWER 20 days 19. If a lienor fails to show cause why his or her lien should not be enforced or fails to start such action before the return date of the summons, the court will immediately order cancellation of the lien. - ANSWER True 20. No lien provided by part 713.22 will continue for longer then ____ years after the claim of lien has been recorded. - ANSWER 1 year 21. No lien provided by part 713.22 will continue for no longer then _______ years after the recording of an amended claim of lien that shows a later date of final furnishing of labor, services, or materials. - ANSWER 1 year 22. The lien of any lienor upon whom Notice of contest of Lien is served and who fails to institute a suit to enforce his or her lien within ________ days after service of such notice will be extinguished automatically. - ANSWER 60 23. The payment bond is required to ______ an owner under s. 713.23 must be furnished by the contractor in at least the amount of the original contract price before commencing the construction of the improvement under the direct contract. - ANSWER exempt 24. A copy the payment bond must be attached to the Notice of Commencement when it is _______. - ANSWER recorded 25. Employee Linda was paid a gross total wage of $63,500 last year. The total amount withheld from her pay for Medicare and Social Security was ____. A. $4,295 B. $4,403 C. $4,858 D. $5,002 - ANSWER C. $4,858 26. A contract will not be enforced if it is ___. A. Oral B. Illegal C. No work is accomplished for 90 days D. All of the above - ANSWER B. Illegal 27. The type of insurance that covers the contractor for losses of material in transit or at temporary storage facilities is known as ___ insurance. A. Liability B. Builders Risk C. Auto Liability D. Fidelity Bond - ANSWER B. Builders Risk 28. The ____ has the duty to record and post a Notice of Commencement to improve real property. A. Owner B. Agent C. Contractor D. Any of the above - ANSWER A. Owner 29. If at all possible, sling angles should be kept greater than ____ degrees. A. 25 B. 45 C. 60 D. 90 - ANSWER B. 45 30. The type of contract where in the contractor agrees to carry out a stipulated job in exchange for a fixed sum of money is a _____ contract. A. Cost plus fixed B. Lump Sum C. GMP D. Cost plus - ANSWER B. Lump Sum 31. When a contractor has to perform extra work for a subcontractor, he will recover the cost in the form of a _____. A. Change Order B. Back charge C. Bond Payment D. Addendum - ANSWER B. Back Charge

Content preview

FLORIDA ELECTRICAL BUSINESS
EXAM STUDY GUIDE 2026/2027
ACCURATE QUESTIONS WITH
CORRECT DETAILED SOLUTIONS ||
100% GUARANTEED PASS
<NEWEST VERSION>


1. Failure to maintain OSHA logs could result in a base penalty of ? -
ANSWER ✔ $1000

2. The minimum number of employees that will require a contractor to obtain
workmen's compensation insurance is ? - ANSWER ✔ 1 employee

3. The type of bond that guarantees that the contractor is I'll perform the work
in accordance with the contract is know as a ? bond - ANSWER ✔
Performance Bond

4. Short term project schedule is detailed explanation of the next two weeks of
construction activities and should be developed and or reviewed by all the
following except ? - ANSWER ✔ Architect

5. The ? usually prepares the project schedule - ANSWER ✔ Project manager

6. In order to provide adequate control the project schedule should be formally
reviewed and updated - ANSWER ✔ At least once every 30 days

7. A contract will not be enforced if it is ? - ANSWER ✔ Illegal

8. According to the statute of frauds a contract need not be in writing and still
be enforceable in Florida if it is ? - ANSWER ✔ Less than $500 in value
and less than 1 year in length

,9. The ? has the duty to record and post a Notice of Commencement to
improve real property - ANSWER ✔ Owner

10.A subcontractor started work on his contract with the General Contractor on
August 1 1999 The owner made the final payment to the general contractor
on September 13 1999 The latest date the subcontractor can serve a notice to
preserve his claim under the Conatitution Lein Law is what date and when ?
- ANSWER ✔ September 13 1999 or day before payment

11.The type of contract we are in the contractor agrees to carry out stipulated
job in exchange for a fix some of the money is a? Contract - ANSWER ✔
Lump sum

12.When a contractor has to perform extra work for a subcontractor he will
recover the cost in the form of a? - ANSWER ✔ Back charge

13.The ? Should be jointly prepared with the material and equipment schedule -
ANSWER ✔ Project schedule

14.Based on the completed contract method for a job bid at $300,000 and
currently 66.67% complete with a gross profit of 16.67% ($50,000) the
current amount of profit recognized would be ? - ANSWER ✔ $0

15.The right to repossess or replevy unused materials from a jobsite will not be
effective if someone, in good faith, purchased it after removal from the site
of the improvement. - ANSWER ✔ True.

16.The contractor must within _____ days after the receipt of the property
owner's request, furnishish to property owner or the property owner's agent a
list of the subcontractors and suppliers who have a contract with the
contractor as of the date the request is received by the contractor. -
ANSWER ✔ 10 days.

17.A property perfected lien may be discharged by an order of the circuit court
of the _____ where the property is located. - ANSWER ✔ county

,18.When any interested party files a complaint, the clerk will issue a summons
to the lienor to show cause within _____ days why his or her lien should not
to be enforced by action or vacated and canceled of record. - ANSWER ✔
20 days

19.If a lienor fails to show cause why his or her lien should not be enforced or
fails to start such action before the return date of the summons, the court will
immediately order cancellation of the lien. - ANSWER ✔ True

20.No lien provided by part 713.22 will continue for longer then ____ years
after the claim of lien has been recorded. - ANSWER ✔ 1 year

21.No lien provided by part 713.22 will continue for no longer then _______
years after the recording of an amended claim of lien that shows a later date
of final furnishing of labor, services, or materials. - ANSWER ✔ 1 year

22.The lien of any lienor upon whom Notice of contest of Lien is served and
who fails to institute a suit to enforce his or her lien within ________ days
after service of such notice will be extinguished automatically. - ANSWER
✔ 60

23.The payment bond is required to ______ an owner under s. 713.23 must be
furnished by the contractor in at least the amount of the original contract
price before commencing the construction of the improvement under the
direct contract. - ANSWER ✔ exempt

24.A copy the payment bond must be attached to the Notice of Commencement
when it is _______. - ANSWER ✔ recorded

25.Employee Linda was paid a gross total wage of $63,500 last year. The total
amount withheld from her pay for Medicare and Social Security was ____.
A. $4,295
B. $4,403
C. $4,858
D. $5,002 - ANSWER ✔ C. $4,858

26.A contract will not be enforced if it is ___.
A. Oral

, B. Illegal
C. No work is accomplished for 90 days
D. All of the above - ANSWER ✔ B. Illegal

27.The type of insurance that covers the contractor for losses of material in
transit or at temporary storage facilities is known as ___ insurance.
A. Liability
B. Builders Risk
C. Auto Liability
D. Fidelity Bond - ANSWER ✔ B. Builders Risk

28.The ____ has the duty to record and post a Notice of Commencement to
improve real property.
A. Owner
B. Agent
C. Contractor
D. Any of the above - ANSWER ✔ A. Owner

29.If at all possible, sling angles should be kept greater than ____ degrees.
A. 25
B. 45
C. 60
D. 90 - ANSWER ✔ B. 45

30.The type of contract where in the contractor agrees to carry out a stipulated
job in exchange for a fixed sum of money is a _____ contract.
A. Cost plus fixed
B. Lump Sum
C. GMP
D. Cost plus - ANSWER ✔ B. Lump Sum

31.When a contractor has to perform extra work for a subcontractor, he will
recover the cost in the form of a _____.
A. Change Order
B. Back charge
C. Bond Payment
D. Addendum - ANSWER ✔ B. Back Charge

Document information

Uploaded on
September 30, 2026
Number of pages
49
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin
3.7
(153)
Sold
776
Followers
19
Items
4051
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions