The shutters and bottom support of non-cantilever slab is removed within a minimum of ______ days. 7 days 14 days 28 days 21 days- Answer -14 Days Shotcrete is used in ________ Repairing surfaces Dam surfaces Curved surfaces All of above- Answer -All of above The shutters and bottom support of non-cantilever beam can be removed within a minimum of ____ 7 days 14 days 28 days 21 days- Answer -14 days Bitumen is used in construction to provide ______ Protective Surface Shining surface Decorative surface All of above- Answer ...