●● Important set of deliverables
Answer: Design documents
●● OSP cost variance
Answer: 10%
●● CSI 27
CSI 28
CSI 31
CSI 33
CSI26
Answer: Telecommunications
electrical safety and security'
Earth work
Utilities
Electrical
,●● NAP groupings
Answer: 4,6,8,12
●● 4 parts security
Answer: Prevent, Detect,Alarm,Secure
●● 3 components of EMI
Answer: Unbalanced electromagnetic fields of the power system,
Coupling between power and telecommunications and susceptibility of
the tele system
●● Direct buried cables collects ground strikes with a distance
determined by soil resistance typically?
Answer: 6.6' to 19.7'
●● A reading of______ ampres is the best possible reading for any
bonding conductor, AC should be less than 1A and DC 500 Miliampres
Answer: 0
●● Maximum value for 2 point bonding in central offices?
Answer: .1 Ohms
, ●● Trencher used in soft loamy soils or loose clay soils depths up to 5' 3'
for smaller trenchers
Answer: Vibratory
●● Trencher used in tight soils, heavy clays or loose rock Depth sup to 5'
Answer: Static
●● Trenchers used in Hardend clay rock soil or adverse conditions
Answer: Rip plow
●● Maximum connector loss reccomended
Answer: .75 DB
●● ____ have individual jackets for each tight buffered fiber.______ has
one jacket and is lower cost.
Answer: Breakout, Distribution
●● _______ and ______ are not used after the first 24 binders.
Answer: Violet and slate
●● Load coil designs to counter the effects of capacitance buildup in
loop lengths over?
Answer: 5.5 KM
CORRECT ANSWERS COMPLETE TEST
PAPER
●● Important set of deliverables
Answer: Design documents
●● OSP cost variance
Answer: 10%
●● CSI 27
CSI 28
CSI 31
CSI 33
CSI26
Answer: Telecommunications
electrical safety and security'
Earth work
Utilities
Electrical
,●● NAP groupings
Answer: 4,6,8,12
●● 4 parts security
Answer: Prevent, Detect,Alarm,Secure
●● 3 components of EMI
Answer: Unbalanced electromagnetic fields of the power system,
Coupling between power and telecommunications and susceptibility of
the tele system
●● Direct buried cables collects ground strikes with a distance
determined by soil resistance typically?
Answer: 6.6' to 19.7'
●● A reading of______ ampres is the best possible reading for any
bonding conductor, AC should be less than 1A and DC 500 Miliampres
Answer: 0
●● Maximum value for 2 point bonding in central offices?
Answer: .1 Ohms
, ●● Trencher used in soft loamy soils or loose clay soils depths up to 5' 3'
for smaller trenchers
Answer: Vibratory
●● Trencher used in tight soils, heavy clays or loose rock Depth sup to 5'
Answer: Static
●● Trenchers used in Hardend clay rock soil or adverse conditions
Answer: Rip plow
●● Maximum connector loss reccomended
Answer: .75 DB
●● ____ have individual jackets for each tight buffered fiber.______ has
one jacket and is lower cost.
Answer: Breakout, Distribution
●● _______ and ______ are not used after the first 24 binders.
Answer: Violet and slate
●● Load coil designs to counter the effects of capacitance buildup in
loop lengths over?
Answer: 5.5 KM