IMSA
WORKZONE,
WORKZONE,
IMSA
IMSA
WORK
WORK
ZONE
ZONE
SAFETY,
SAFETY,
IMSA
1 of
IMSA
103https://online2pdf.com/remove-pdf-header-footer
WORKZONE
WORKZONE SAFETY,
SAFETY,
IMSAIMSA
WORKZONE
WORKZONESAFETYhttps://online2pdf.com/remove-pdf-header-footer
SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer
IMSA WORKZONE, IMSA WORK ZONE
SAFETY, IMSA WORKZONE SAFETY,
IMSA WORKZONE SAFETY
INCLUDED
IMSA WORKZONE ANSWERED
MSA WORK ZONE SAFETY ANSWERED
IMSA WORKZONE SAFETY ANSWERED
IMSA WORKZONE SAFETY ANSWERED
The work zone starts at the first advance warning sign; therefore, where should
the flagger stand when directing traffic in a TTC zone?
On the shoulder adjacent to traffic being controlled
How many orange and black TTC signs should there be in each direction on a 2-
way, 2-lane rural roadway?
three
pg. 1 https:// /1046012703/imsa-workzone-imsa-work-zone-safety-imsa-workzone-safety-imsa-workzone-safety-
flash-cards/?new
IMSA WORKZONE,
Page 1 of 103https://online2pdf.com/remove-pdf-header-footer
IMSA WORK ZONE SAFETY, IMSA Page WORKZONE
1https://online2pdf.com/remove-pdf-header-footer
SAFETY, IMSA WORKZONE SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer
, IMSA
IMSA
WORKZONE,
WORKZONE,
IMSA
IMSA
WORK
WORK
ZONE
ZONE
SAFETY,
SAFETY,
IMSA
2 of
IMSA
103https://online2pdf.com/remove-pdf-header-footer
WORKZONE
WORKZONE SAFETY,
SAFETY,
IMSAIMSA
WORKZONE
WORKZONESAFETYhttps://online2pdf.com/remove-pdf-header-footer
SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer
What should the sign spacing be on a two-lane, two-way rural highway?
500 ft.
How many feet apart should the advanced warning signs be on a high speed
urban roadway?
350 ft
For additional emphasis on a high speed urban roadway, signs may be posted:
_________
on the left hand side of the highway
Taper length refers to:
The distance required to safely route traffic from one lane to another
pg. 2 https:// /1046012703/imsa-workzone-imsa-work-zone-safety-imsa-workzone-safety-imsa-workzone-safety-
flash-cards/?new
IMSA WORKZONE,
Page 2 of 103https://online2pdf.com/remove-pdf-header-footer
IMSA WORK ZONE SAFETY, IMSA Page WORKZONE
2https://online2pdf.com/remove-pdf-header-footer
SAFETY, IMSA WORKZONE SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer
, IMSA
IMSA
WORKZONE,
WORKZONE,
IMSA
IMSA
WORK
WORK
ZONE
ZONE
SAFETY,
SAFETY,
IMSA
3 of
IMSA
103https://online2pdf.com/remove-pdf-header-footer
WORKZONE
WORKZONE SAFETY,
SAFETY,
IMSAIMSA
WORKZONE
WORKZONESAFETYhttps://online2pdf.com/remove-pdf-header-footer
SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer
taper length is based on:
speed and width of lane closed
in a taper, the maximum distance between channelizing devices should be:
equal in feet to the speed limit
on a barricade, if the stripes start at the upper right side and angle down to the
lower left side: ________
traffic should pass to the left
at night and/or on high speed roads greater than 45 mph, cones shall be:
__________
at least 28" tall and retroreflectorized with at least two white bands and two
orange bands
one a rural two-lane road, where would you place the flagger in respect to the
beginning of the taper for a closed lane?
at the beginning of the taper
pg. 3 https:// /1046012703/imsa-workzone-imsa-work-zone-safety-imsa-workzone-safety-imsa-workzone-safety-
flash-cards/?new
IMSA WORKZONE,
Page 3 of 103https://online2pdf.com/remove-pdf-header-footer
IMSA WORK ZONE SAFETY, IMSA Page WORKZONE
3https://online2pdf.com/remove-pdf-header-footer
SAFETY, IMSA WORKZONE SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer
, IMSA
IMSA
WORKZONE,
WORKZONE,
IMSA
IMSA
WORK
WORK
ZONE
ZONE
SAFETY,
SAFETY,
IMSA
4 of
IMSA
103https://online2pdf.com/remove-pdf-header-footer
WORKZONE
WORKZONE SAFETY,
SAFETY,
IMSAIMSA
WORKZONE
WORKZONESAFETYhttps://online2pdf.com/remove-pdf-header-footer
SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer
What are some factors that should be considered in formulating a TTC plan?
1) Type of work to be done
2) traffic volume
3) traffic speed
4) school bus routes
the rerouting of traffic onto a temporary bypass road is known as a: __________
diversion
pavement markings no longer needed should be:
removed by grinding
a TTC zone should be checked:
routinely
pg. 4 https:// /1046012703/imsa-workzone-imsa-work-zone-safety-imsa-workzone-safety-imsa-workzone-safety-
flash-cards/?new
IMSA WORKZONE,
Page 4 of 103https://online2pdf.com/remove-pdf-header-footer
IMSA WORK ZONE SAFETY, IMSA Page WORKZONE
4https://online2pdf.com/remove-pdf-header-footer
SAFETY, IMSA WORKZONE SAFETY.pdfhttps://online2pdf.com/remove-pdf-header-footer