1. What is the primary purpose of OSHA regulations on a construction site?
A. Increase profits
B. Protect worker safety
C. Reduce project schedules
D. Increase material usage
Correct Answer: B. Protect worker safety
Rationale: OSHA regulations establish safety standards designed to prevent workplace injuries,
illnesses, and fatalities.
2. Which document defines the scope of work between contractor and owner?
A. Invoice
B. Contract
C. Payroll Record
D. Purchase Order
Correct Answer: B. Contract
Rationale: A contract legally establishes responsibilities, scope, schedule, and payment terms for
a project.
3. What is the first step in preparing a construction estimate?
A. Purchase materials
B. Calculate labor costs
C. Review plans and specifications
D. Hire subcontractors
Correct Answer: C. Review plans and specifications
,Rationale: Accurate estimating begins with understanding all project requirements shown in the
plans and specifications.
4. Which type of drawing shows dimensions and layout details?
A. Elevation drawing
B. Plan drawing
C. Sketch note
D. Invoice sheet
Correct Answer: B. Plan drawing
Rationale: Plan drawings provide dimensions, locations, and layout information needed for
construction.
5. What does PPE stand for?
A. Project Planning Equipment
B. Personal Protective Equipment
C. Professional Project Estimate
D. Public Protection Element
Correct Answer: B. Personal Protective Equipment
Rationale: PPE includes hard hats, gloves, eye protection, and other equipment used to protect
workers.
6. Which foundation component distributes loads to the soil?
A. Joist
B. Footing
C. Stud
D. Header
Correct Answer: B. Footing
Rationale: Footings spread structural loads over a larger soil area to prevent settlement.
7. What is the purpose of a change order?
A. Hire employees
B. Modify the original contract
C. Schedule inspections
D. Purchase tools
Correct Answer: B. Modify the original contract
, Rationale: Change orders document approved changes in scope, cost, or schedule after contract
execution.
8. Which soil type generally provides the best bearing capacity?
A. Organic soil
B. Clay
C. Dense gravel
D. Topsoil
Correct Answer: C. Dense gravel
Rationale: Dense gravel offers excellent load-bearing characteristics and drainage properties.
9. What is a critical path in scheduling?
A. Emergency exit route
B. Longest sequence of activities determining project duration
C. Material delivery route
D. Safety inspection route
Correct Answer: B. Longest sequence of activities determining project duration
Rationale: Delays on critical path activities directly affect overall project completion.
10. Which tool is commonly used to verify level surfaces?
A. Chisel
B. Spirit level
C. Hammer
D. Wrench
Correct Answer: B. Spirit level
Rationale: A spirit level confirms horizontal and vertical alignment during construction.
11. What is the primary purpose of reinforcing steel in concrete?
A. Improve color
B. Increase tensile strength
C. Reduce weight
D. Lower cost
Correct Answer: B. Increase tensile strength
Rationale: Reinforcing steel helps concrete resist tensile forces and cracking.