• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

Cmit Exam (200 Multiple Choice) Actual Exam Complete Questions & Correct Detailed Answers

Document preview thumbnail
Preview 3 out of 21 pages

CMIT EXAM (200 MULTIPLE CHOICE) ACTUAL EXAM COMPLETE QUESTIONS & CORRECT DETAILED ANSWERS

Content preview

CMIT EXAM (200 MULTIPLE CHOICE)
ACTUAL EXAM COMPLETE
QUESTIONS & CORRECT DETAILED
ANSWERS
A CM's role and responsibilities are governed solely by the Owner/CM Agreement.
tf tf tf tf tf tf tf tf tf tf tf


True False - ANSWERS-True tf tf tf




There are two basic forms of CM, agency and at-
tf tf tf tf tf tf tf tf tf


risk. Each form provides for the basic services of construction management practice. H
tf tf tf tf tf tf tf tf tf tf tf tf


owever, there are some key differences. Which of the following do not apply to both CM
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


forms?
A) Both forms provide advice to the owner on constructibility, budget and the schedule.
tf tf tf tf tf tf tf tf tf tf tf tf tf


B) Both require that the liabilities and risks assumed by the parties be clearly understoo
tf tf tf tf tf tf tf tf tf tf tf tf tf tf


d, coordinated, and stated in the respective contracts.
tf tf tf tf tf tf tf


C) Both forms allow the CM to function in an advisory role for the entire engagement of t
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


he CM. tf


D) Services can vary based on the contractual relationships of the parties and the risks t
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


hat are assumed. - ANSWERS-
tf tf tf tf


C) Both forms allow the CM to function in an advisory role for the entire engagement of t
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


he CM. tf




Construction management had its beginnings in the early to mid- tf tf tf tf tf tf tf tf tf


1960's. Which of the following factors contributed to the initial use of this delivery syste
tf tf tf tf tf tf tf tf tf tf tf tf tf tf


m?
A) The need to reduce the overall time and cost associated with project delivery.
tf tf tf tf tf tf tf tf tf tf tf tf tf


B) The increasing cost of money and the unpredictability of project funding streams.
tf tf tf tf tf tf tf tf tf tf tf tf


C) The changing role of the general contractor and the increasing numbers of specialty t
tf tf tf tf tf tf tf tf tf tf tf tf tf tf


rade contractors. tf


D) All of the above. - ANSWERS-D) All of the above.
tf tf tf tf tf tf tf tf tf tf




The General Services Administration was the first federal agency to use construction m
tf tf tf tf tf tf tf tf tf tf tf tf


anagement. - ANSWERS-True tf tf




The General Services Administration, the Department of Health, Education and Welfar
tf tf tf tf tf tf tf tf tf tf


e (now HHS), and the Veterans Administration ran into similar difficulties in the use of c
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


onstruction management. Which of the following was/ tf tf tf tf tf tf


were common problems for all three agencies?
tf tf tf tf tf tf


A) Funding restrictions
tf tf


B) Claims
tf


C) Change conditions
tf tf


D) All of the above - ANSWERS-D) All of the above
tf tf tf tf tf tf tf tf tf tf




CMAA was formed and incorporated 1982 with its primary focus being the growth and d
tf tf tf tf tf tf tf tf tf tf tf tf tf tf


evelopment of the construction management profession. - ANSWERS-True tf tf tf tf tf tf tf

,The CMAA Construction Management Standards of Practice is intended as a guide to t
tf tf tf tf tf tf tf tf tf tf tf tf tf


he range of services that constitute professional construction management. They seek
tf tf tf tf tf tf tf tf tf tf tf


to meet the documented need for definitions of what construction management service
tf tf tf tf tf tf tf tf tf tf tf


s are, without unduly structuring the methodologies by which those services are provide
tf tf tf tf tf tf tf tf tf tf tf tf


d by the CM. - ANSWERS-True
tf tf tf tf tf




The goals of the Construction Management Association of America (CMAA) include:
tf tf tf tf tf tf tf tf tf tf


A) Setting standards and developing contract documents for construction management
tf tf tf tf tf tf tf tf tf t


practice.
f


B) Expanding the understanding of the construction management concept and its use i
tf tf tf tf tf tf tf tf tf tf tf tf


n the marketplace.
tf tf


C) Advocacy for construction management in the legislative, regulatory, and judicial are
tf tf tf tf tf tf tf tf tf tf tf


nas of federal, state, and local governments.
tf tf tf tf tf tf


D) All of the above. - ANSWERS-D) All of the above
tf tf tf tf tf tf tf tf tf tf




The fact that an individual is certified or licensed in any other profession does not, per s
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


e, establish him/her as a qualified CM.
tf tf tf tf tf tf


True False - ANSWERS-True tf tf tf




Certification as a CM means the construction management practitioner has "state of the tf tf tf tf tf tf tf tf tf tf tf tf


art" knowledge and capability to practice construction management.
tf tf tf tf tf tf tf tf


True False - ANSWERS-False tf tf tf




Recruiting and training are business matters and normally do not involve ethical concer
tf tf tf tf tf tf tf tf tf tf tf tf


ns.
True False - ANSWERS-False tf tf tf




Construction management is a concept that is susceptible to overselling. tf tf tf tf tf tf tf tf tf


True False - ANSWERS-True tf tf tf




Failure to provide quality services is a business and not an ethical question.
tf tf tf tf tf tf tf tf tf tf tf tf


True False - ANSWERS-False tf tf tf




Contracting for adequate fees is both a business and an ethical issue. tf tf tf tf tf tf tf tf tf tf tf


True False - ANSWERS-True tf tf tf




The ethics of the CM profession focus primarily on a CM's relationships in dealing with it
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


s clients.
tf


True False - ANSWERS-True tf tf tf




The possible approaches for delivering a project are virtually unlimited. A key reason for
tf tf tf tf tf tf tf tf tf tf tf tf tf


such variations is:
tf tf tf


A) The different roles that can be assumed by project participants.
tf tf tf tf tf tf tf tf tf tf


B) Different forms of contracts and methods of compensation that can be used.
tf tf tf tf tf tf tf tf tf tf tf tf


C) The different levels of care, responsibility, and risks assumed by the parties involved
tf tf tf tf tf tf tf tf tf tf tf tf tf


.
D) All of the above. - ANSWERS-D) All of the above
tf tf tf tf tf tf tf tf tf tf




The traditional delivery system is characterized by executing the major phases of a proj
tf tf tf tf tf tf tf tf tf tf tf tf tf


ect in: tf

, A) An overlapping concept
tf tf tf


B) A linear sequence
tf tf tf


C) A fast track method
tf tf tf tf


D) All of the above - ANSWERS-B) A linear sequence
tf tf tf tf tf tf tf tf tf




A key advantage of the traditional delivery approach is:
tf tf tf tf tf tf tf tf


A) With the traditional delivery system, the cost of the construction phase is known befo
tf tf tf tf tf tf tf tf tf tf tf tf tf tf


re construction starts.
tf tf


B) Facility features are fully determined & specified.
tf tf tf tf tf tf tf


C) When the construction contract is signed, the major risk belongs to the contractor.
tf tf tf tf tf tf tf tf tf tf tf tf tf


D) All of the above - ANSWERS-B) Facility features are fully determined & specified.
tf tf tf tf tf tf tf tf tf tf tf tf tf




Design-build and at- tf tf


risk construction management delivery systems allow the option to fast-
tf tf tf tf tf tf tf tf tf


track or phase a project. tf tf tf tf


True False - ANSWERS-True tf tf tf




Most definitions of construction management are similar. However, a contractual definit
tf tf tf tf tf tf tf tf tf tf


ion is not known until:
tf tf tf tf


A) The legal form of the CM contract is chosen.
tf tf tf tf tf tf tf tf tf


B) The specific scope of services to be provided is identified.
tf tf tf tf tf tf tf tf tf tf


C) The relationship of the CM to others and the risks and authority assumed by the parti
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


es are clearly defined.
tf tf tf


D) All of the above - ANSWERS-D) All of the above
tf tf tf tf tf tf tf tf tf tf




21. tf


In a CM-at-
tf tf


Risk arrangement once construction begins and the CM converts from the professional
tf tf tf tf tf tf tf tf tf tf tf tf


advisory role of a CM to the contractual role of a general contractor, the CM has no impli
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


ed duties of loyalty and care to the owner.
tf tf tf tf tf tf tf tf


True False - ANSWERS-True tf tf tf




The agency CM does not perform design or actual construction work.
tf tf tf tf tf tf tf tf tf tf


True False - ANSWERS-True tf tf tf




Under the CM-at- tf tf


Risk delivery method, the owner usually must deal with the hybrid of a construction man
tf tf tf tf tf tf tf tf tf tf tf tf tf tf


ager and a general contractor.
tf tf tf tf


True False - ANSWERS-True tf tf tf




Under a CM-at-risk contract, which of the following statements are true?
tf tf tf tf tf tf tf tf tf tf tf


A) The CM, in most cases, holds the trade and/or specialty contracts.
tf tf tf tf tf tf tf tf tf tf tf


B) The CM has the right to enforce the schedule, pay the trade or subcontractors, and te
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


rminate them if such action becomes necessary. tf tf tf tf tf tf


C) On some CM-at-
tf tf tf


Risk contracts, the CM has the option of performing portions of the work with its own res
tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf tf


ources (unless prohibited by law on certain public projects).
tf tf tf tf tf tf tf tf


D) All of the above - ANSWERS-D) All of the above
tf tf tf tf tf tf tf tf tf tf

Document information

Uploaded on
September 28, 2026
Number of pages
21
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
luckytests
1.0
(1)
Sold
4
Followers
1
Items
465
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions