Exam (elaborations)

Florida Contractor Administration Exam #4 Review 2026 | 173 Verified Q&A | Graded A+

Document preview thumbnail
Preview 4 out of 71 pages

Florida Contractor Administration Exam #4 Review 2026 – Your Complete Study Guide to Pass with Confidence Prepare for the Contractor Administration portion of your Florida Contractor licensing exam with this comprehensive review featuring 173 high-yield questions and verified answers. Whether you're taking the exam for the first time or refreshing your knowledge, this resource covers everything you need to know to pass the administration section with a top score. This isn't just a question list—it's a complete exam prep system designed to reinforce your understanding of construction contracts, project management, lien laws, insurance, OSHA regulations, and Florida-specific requirements. What's Inside (Key Content Areas): Construction Contracts: AIA documents, prime contracts, subcontracts, change orders, addenda, complete agreement clauses, and the three essential terms. Contract Types: Lump-sum, cost-plus, cost-plus with guaranteed maximum price (GMP), unit price, and time and materials. Lien Laws (Florida Construction Lien Law): Notice to Owner, Notice of Commencement, lien rights (who has them, who doesn't), partial lien releases, release through time certain, and improper payments. Project Management: Schedule of values, quantity take-offs, punch lists, substantial completion, retainage, and progress payments. Insurance & Risk: All-risk insurance, workers' compensation (penalties for non-compliance, Drug-Free Workplace Program), general liability, and builder's risk. OSHA & Safety: Trench safety, excavation marking, health and safety orders, stop work orders, and exit requirements. Florida Building Code: Permits (when required, when exempt), certificates of occupancy, temporary certificates, zoning codes, setbacks, and sprinkler requirements. Employment Law: Labor Management Relations Act (LMRA), National Labor Relations Act (NLRA), ADA (15+ employees), I-9 verification, and W-2/W-4 forms. Financial Management: Balance sheet, income statement, revenue-expenses method, GAAP, unearned revenue, and bank reconciliation. Licensing Requirements: Qualified contractor thresholds ($1,000), license renewal deadlines, penalties for contracting without a license, and demolitions (steel towers over 50 feet). Dispute Resolution: Material breach, owner interference, liquidated damages, and notice requirements (14 days, 21 days). Passive Design & Energy Efficiency: U-factors, Low E glass, solar screens, and glazed fenestration products. CSI Master Format: Division 5 (metals), Division 6 (wood), Division 7 (thermal/moisture), and Division 4 (masonry).

Content preview

Florida Contractor Administration Exam #4 Review 2026 |
Verified Q&A | Graded A+
1. In a project where several glazed fenestration products lack U-factors, what
steps should a contractor take to ensure compliance with Florida's energy
efficiency regulations?

Use the products without any modifications.

Request new U-factors from the manufacturers for all products.

Discard all products without U-factors.

Assign default factors to the products and document them
appropriately.

2. Who is primarily accountable for ensuring that shop drawings meet the
construction criteria?

Subcontractor

Contractor

Architect

Engineer

3. In a scenario where a subcontractor needs to modify their work due to
unforeseen conditions, what steps should the contractor take according to
AIA guidelines?

The building official must be consulted before any changes are
documented.

The subcontractor can directly inform the architect to make changes.

The contractor should issue a change order to document and
authorize the modifications.

, The contractor must seek approval from the owner before any
changes can be made.

4. In which phase of a construction project is the identification of material lead
time crucial?

Scheduling

Estimating

Planning

Networking

5. If a contractor is planning to install electrical service to a new playground,
what steps should they take to ensure compliance with Florida's permit
requirements?

The contractor should only notify the local authorities after the
installation is complete.

The contractor should apply for the necessary electrical permit
before starting the installation.

The contractor should only focus on obtaining permits for structural
elements.

The contractor can proceed without a permit if the project is small.

6. Which type of project is exempt from requiring a local building permit in
Florida?

Being done by the property owner personally

That does not affect public health or safety

Contract for less than $2,500

On state-owned property

,7. If a contractor enters into an oral contract for a project expected to take 400
days, what legal issues might arise in Florida?

The contractor will receive an automatic extension for the project
duration.

The contractor can legally complete the project without any issues.

There are no legal implications for exceeding the time limit.

The contractor may face legal challenges due to exceeding the 365-
day limit for oral contracts.

8. What action can the building official take if work is NOT proceeding to code?

Issue a Stop Work Order

Suspend the contractor's license

Revoke the permit

Arrest the contractor

9. If an owner fails to allow the contractor time to inspect and correct defects
before filing a lawsuit, what potential consequence might they face?

The owner may be required to pay additional fees.

The Building Department may impose fines on the owner.

The lawsuit may be dismissed due to failure to follow proper
procedure.

The contractor may be penalized for not fixing the defect.

10. Describe the primary purpose of the Labor Management Relations Act
(LMRA) in relation to contractors.

, The LMRA focuses on immigration control for workers in the
construction industry.

The Labor Management Relations Act (LMRA) regulates labor
relations and protects the rights of employers and employees in
industries affecting interstate commerce.

The LMRA is concerned with the issuance of building permits.

The LMRA provides guidelines for safety regulations in construction.

11. What is the primary purpose of a permitted site plan in construction?

To guide the contractor in starting the construction process.

To specify the safety regulations for the site.

To outline the financial terms of the contract.

To provide a list of required building permits.

12. A contractor license is required when the total cost, including materials, is
more than

1,000

100

10,000

100,000

13. Which of the following falls under passive design strategy for buildings?

Geometry of the building should allow materials with high heat
capacity to store solar energy during the day and release it in the
evening

Locate the short side of a building on an east-west axis to minimize
solar loads during summer

Document information

Uploaded on
September 28, 2026
Number of pages
71
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$19.00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
191
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions