1. What is the primary purpose of a geotechnical investigation
before beginning a tunneling project?
A. Determine the paint color for tunnel equipment
B. Select office locations for project staff
C. Identify subsurface conditions that may affect excavation,
support, groundwater control, and construction methods
D. Establish the contractor's payroll schedule
Rationale: A geotechnical investigation provides information about
soil and rock conditions, groundwater, faults, voids, and other
subsurface features. This information is essential for selecting safe
excavation methods, support systems, and groundwater-control
measures.
, 2. Which soil characteristic is especially important when evaluating
the stability of an excavated tunnel face?
A. Soil color
B. Cohesion and shear strength
C. Organic color variation
D. Surface temperature
Rationale: Cohesion and shear strength determine how well soil can
resist deformation and failure. Low-strength or poorly cohesive soils
may require immediate support or specialized excavation methods.
3. What is the primary function of tunnel ground support?
A. Increase tunnel lighting
B. Reduce equipment noise
C. Maintain excavation stability and protect workers and
structures
D. Improve concrete color
Rationale: Ground-support systems such as rock bolts, steel ribs,
shotcrete, and liners are installed to stabilize the excavation. Proper
support reduces the risk of rock falls, ground movement, and tunnel
collapse.
4. Which method is commonly used to excavate a tunnel through
relatively competent rock?
, A. Hand spreading
B. Drill-and-blast excavation
C. Surface grading
D. Asphalt milling
Rationale: Drill-and-blast excavation uses drilled holes containing
controlled explosives to fragment rock. It is widely used where rock
conditions and project requirements make mechanical excavation less
practical.
5. What is the primary advantage of a tunnel boring machine (TBM)?
A. It eliminates the need for engineering
B. It requires no ground investigation
C. It provides continuous, controlled mechanical excavation for
suitable ground conditions
D. It operates without any ground support
Rationale: TBMs are designed for mechanized excavation and can
provide continuous production. Depending on the machine type, they
may also provide systems for spoil removal and installation of tunnel
support or lining.
6. What does the term “overbreak” mean in tunneling?
A. Excavating less material than planned
B. Excavating beyond the specified tunnel profile
, C. Increasing tunnel ventilation
D. Increasing concrete strength
Rationale: Overbreak occurs when excavation extends outside the
designed excavation boundary. Excessive overbreak can increase
support requirements, material costs, and ground instability.
7. What is the purpose of tunnel ventilation during excavation?
A. Increase groundwater pressure
B. Provide fresh air and remove dust, fumes, gases, and
contaminants
C. Harden surrounding soil
D. Increase tunnel excavation diameter
Rationale: Excavation equipment, blasting, diesel engines, and
disturbed ground can produce hazardous airborne contaminants.
Ventilation helps maintain acceptable atmospheric conditions for
workers.
8. Which instrument is commonly used to measure ground
movement or deformation around a tunnel?
A. Tape dispenser
B. Extensometer
C. Paint roller
D. Concrete vibrator
Questions and Correct Answers (Verified
Answers) Plus Rationale 2027 Q&A|
Instant Download Pdf
1. What is the primary purpose of a geotechnical investigation
before beginning a tunneling project?
A. Determine the paint color for tunnel equipment
B. Select office locations for project staff
C. Identify subsurface conditions that may affect excavation,
support, groundwater control, and construction methods
D. Establish the contractor's payroll schedule
Rationale: A geotechnical investigation provides information about
soil and rock conditions, groundwater, faults, voids, and other
subsurface features. This information is essential for selecting safe
excavation methods, support systems, and groundwater-control
measures.
, 2. Which soil characteristic is especially important when evaluating
the stability of an excavated tunnel face?
A. Soil color
B. Cohesion and shear strength
C. Organic color variation
D. Surface temperature
Rationale: Cohesion and shear strength determine how well soil can
resist deformation and failure. Low-strength or poorly cohesive soils
may require immediate support or specialized excavation methods.
3. What is the primary function of tunnel ground support?
A. Increase tunnel lighting
B. Reduce equipment noise
C. Maintain excavation stability and protect workers and
structures
D. Improve concrete color
Rationale: Ground-support systems such as rock bolts, steel ribs,
shotcrete, and liners are installed to stabilize the excavation. Proper
support reduces the risk of rock falls, ground movement, and tunnel
collapse.
4. Which method is commonly used to excavate a tunnel through
relatively competent rock?
, A. Hand spreading
B. Drill-and-blast excavation
C. Surface grading
D. Asphalt milling
Rationale: Drill-and-blast excavation uses drilled holes containing
controlled explosives to fragment rock. It is widely used where rock
conditions and project requirements make mechanical excavation less
practical.
5. What is the primary advantage of a tunnel boring machine (TBM)?
A. It eliminates the need for engineering
B. It requires no ground investigation
C. It provides continuous, controlled mechanical excavation for
suitable ground conditions
D. It operates without any ground support
Rationale: TBMs are designed for mechanized excavation and can
provide continuous production. Depending on the machine type, they
may also provide systems for spoil removal and installation of tunnel
support or lining.
6. What does the term “overbreak” mean in tunneling?
A. Excavating less material than planned
B. Excavating beyond the specified tunnel profile
, C. Increasing tunnel ventilation
D. Increasing concrete strength
Rationale: Overbreak occurs when excavation extends outside the
designed excavation boundary. Excessive overbreak can increase
support requirements, material costs, and ground instability.
7. What is the purpose of tunnel ventilation during excavation?
A. Increase groundwater pressure
B. Provide fresh air and remove dust, fumes, gases, and
contaminants
C. Harden surrounding soil
D. Increase tunnel excavation diameter
Rationale: Excavation equipment, blasting, diesel engines, and
disturbed ground can produce hazardous airborne contaminants.
Ventilation helps maintain acceptable atmospheric conditions for
workers.
8. Which instrument is commonly used to measure ground
movement or deformation around a tunnel?
A. Tape dispenser
B. Extensometer
C. Paint roller
D. Concrete vibrator